Installation Instructions
5
Installing the boiler
Logano G115 WS US/CA - Technical specifications are subject to change without prior notice.
19
5.2 Fitting the water connections
5.2.1 Fitting the B-kit
The safety relief valve and the pressure/temperature
gauge are mounted on the supply manifold (included in B-
Kit) on the VK boiler supply connection as follows:
V Fit and seal unmarked end of double nipple into con-
nection VK on the boiler.
V Converter is paint-marked pink and stamped with the
designation NPT on the end with the 1¼" NPT thread.
Fig. 13 Checking thread length on double nipple
V Seal 90° 1¼" NPT street elbow on double nipple.
V Fit and seal manifold to 90° elbow. The manifold can
face in different directions (Æ Fig. 14).
V Seal pressure/temperature gauge to supply manifold.
Fig. 14 Installing B-Kit
1 90° 1¼" NPT street elbow
2 Double nipple
3 Supply manifold
4 Pressure/temperature gauge
5 Pressure relief valve
6 90° ¾" NPT elbow
Caution: Risk of system damage from leak-
ing connections.
V Support the pipes to the boiler to prevent
them from being under stress.
Do not fit the safety valve until the leak test
(Æ Chapter 5.3, page 21) has been com-
pleted.
The relief valve must be installed in a vertical
position.
We recommend installing a dirt filter (option-
al) in the boiler return connection to reduce
build-up of debris on the water side.