Installation Instructions

5
Installing the boiler
Logano G115 WS US/CA - Technical specifications are subject to change without prior notice.
25
5.8.1 Fitting the controls
V Position the tabs of the controls in the slots.
V Slide the controls forwards towards the burner door.
V Let the flexible hooks of the control panel click into the
openings by pushing the control panel down.
Fig. 20 Fitting the controls
1 Flexible catches
2 Locating tabs
3 Slots
4 Locating holes
V Remove the controls cover.
Unscrew the cover screws.
V Secure the controls with self-tapping screws.
Fig. 21 Cover, removing
1 Cover screws
2 Self-tapping screws
1
2
3
7 747 019 141-21.1RS
1
2
7 747 019 141-22.1RS