Installation Instructions

2
Product description
Logano G115 WS US/CA - Technical specifications are subject to change without prior notice.
7
2.6 Pack contents
Upon delivery, check that the packaging is complete and
undamaged.
Component Qty Packaging
Boiler heat exchanger 1 1 pallet
Boiler casing, factory-fit-
ted to boiler heat
exchanger
Burner door and burner
door panel, factory-fitted
to boiler heat exchanger
B-kit components:
1 Supply manifold
G115"US"
elbow 90 ° 1-1/4"
elbow 90 ° 3/4"
double nipple R1-1/4"-
1-1/4" NPT x 75
boiler drain 3/4"
relief valve 3/4" x 3/4"
30PSI
temperature/pressure
gauge
Bolt set B-Kit
G115"US"
adjustable boiler feet
M10 x 51 packed
1 1 foil package
1)
1) in the combustion chamber in the boiler
Controller 1 1 box
Technical documentation 1 foil package
Tab. 1 Package Contents