5 
5.2 Checklist: important parameters for commissioning
When commissioning the device, ensure the satisfaction of both parties, making sure that the 
heating system meets the customer's needs and will not give cause for complaints. In our 
experience, the following parameters are very important for the satisfaction of the system user:
B Find out the system owner's requirements and preferences regarding:
Setting options
Factory 
setting
SERVICE 
MENU\ 
settings\
The required type of reduction 
(night setback)
Outdoor setback 
mode;
reduced operation;
Room setback mode;
shut-down mode
Outdoor 
setback 
mode
heating circuit x, 
page 28
The required control mode outside temp. contr., 
room temp. controlled
outside 
temp. contr.
heating circuit x, 
page 31
The correct heating curve By means of the 
following parameters: 
design temperature, 
minimum outside 
temperature, offset, 
and set room 
temperature
heating circuit x, 
page 28
The correct building type 
(adjusting the outside temp.)
light, medium, heavy medium plant data, 
page 24
The switching frequency of the 
DHW circulation pump
1)
1) This function is not available for boilers with UBA1.x, DBA, UBA-H3 or for DHW heating according to the 
instantaneous water heating principle.
permanent operation, 
1 x, 2 x, 3 x, 4 x, 5 x, 
6 x per hour for 
3 minutes at a time
2 x domestic hot 
water, page 37
Priority DHW yes, no yes heating circuit x, 
page 29
Switching program 
(times)
Standard program 
(e.g. family), user 
defined program
family heating circuit x, 
page 30
Tab. 7 Checklist: important parameters for commissioning