Installation Guide

HDPC® Rigid Core Vinyl - InstallaƟŽŶ Guide
HDPC® is a rigid waterproof High Density PlasƟĐomposite ŇŽoring with patent pending teĐhnology that uses no
adhesive to bond the vinyl layers together and features the patented UnŝĐlŝĐand Unipush systems and is installed as a glueless
ŇŽaƟng Ňoor. The inƚĞƌůŽĐŬŝng planŬs loĐŬ together to provide a ƟŐŚt water resistant seam, ĐĂn be installed over most ŇŽor surfĂĐĞs,
and is suitable for both residenƟal and light ĐŽŵmeƌĐŝĂůinterior appliĐaƟŽns.
General InformaƟon
1. Flooring should be transported and stored in a neatly staĐŬed fashion on a smooth ŇĂt surfĂĐĞ Be sure to
InspeĐƚthe run numbers/produĐƟon dates on the boxes as diīerent runs may be slightly diīerent, onĐe installed it
beĐŽŵes the installers responsibility. PuƌĐhase enough material to do at least 105% of theĐovered area.
2. Maintain a ĐŽnstant temperature between 60° and 85°F (18.33° and 29.44°C) before, during, and ĂŌĞƌŝnstallaƟŽn.
3. ĐĐlimaƟŽn is ideal, but not requ
ired; ŇŽoring should be stored in the areas that it is going to be installed in for a minimal
24 hours to assure equilibrium.
4. HDPC Vinyl PlanŬs should only be installed aŌĞƌother trades haveĮnished and the jobsite has beenĐůeaned and Đůeared of
debris thatĐould potenƟally damage aĮnished installaƟŽn.
5. No addŝƟonal padding is required as there is an aƩĂĐhed padding to the bĂĐŬ of the planŬs.
6. InspeĐƚ ŇŽoring for damage, defeĐƚs, or shading issues before installa
ƟŽnĐůĂŝms for visual defeĐƚs will not be aĐĐepted
ĂŌĞƌĐuƫng and/or installed.
7. Mix and install planŬs from several diīerent ĐĂƌtons during installaƟŽŶ to ensure a random appearanĐe.
8. Leave 1/4 inĐh gap for expansion around the enƟre perimeter of theŇŽoring.
9. T moldings are reĐommended at all doorways to prevent separaƟŽn or buĐŬůŝng issues due to adjoining rooms.
10. Flooring should be proƚĞĐƚed from direĐƚ exposure to UV light by using shades or blinds when neĐessary.
11. ůůŇŽoring will sĐƌĂtĐh, please beĐauƟous when moving or transpoƌƟng items ĂĐƌoss your ŇŽor as sĐƌĂtĐhes are not a
warranted issue.
Pre-InstallaƟon
SubŇoors:
PlanŬsĐan be installed over a variety of subŇŽor surfĂĐĞs inĐůƵdinŐĐonĐƌete on all grade levels, wood and many other exisƟng hard
surfĂĐĞŇŽors. The subŇŽors must beĐůean, smooth,ŇĂt, solid (no movement), and dry. Do not install planks over Ňoors that are
sloped for drainage. Any uneven areas greater than 3/16” in a 10 foot radius should be leveled with a Portland Đement based
patĐhinŐĐompound. Wellmade Vinyl PlanŬis impervious to water damage but they do not prevent the transmiss
ion of moisture.
Care should be taŬen to Ŭeep moistureĨƌŽŵĐolleĐƟng on either side of theŇŽoring to prevent the growth of unhealthy mold and
mildew.
Concrete SubŇoors:
PlanŬsĐan be installed over ĐŽnĐƌete on all grade levels; a moisture barrier is reĐŽmmended but not required, and shouldĐonsist of
at least a 6 mil polyethylene Įlm with the sheets overlapping 6” and taped to prevent moisture migraƟng to theŇŽoring. Moisture
vapor emissions should not edžĐeed 5 lbs./24 hour per 1,000 sq. when
tested with the AnhydrousĂůĐŝum Chloride Test in
aĐĐŽƌdanĐe with ASTM F 1869 or 85% RH in aĐĐŽƌdanĐe with ASTM F 2170 “Standard Test Method for Determining RelaƟ
ve
Humidity in ConĐƌete Slabs using in situ Probes. Any uneven areas greater than 3/16” in a 10 foot radius should be leveled with a
PortlandĐĞment based patĐhinŐĐompound. Holes andĐƌaĐŬs in theĐĞment should be paƚĐhed, and expansion joints should beĮlled
with a latex patĐhinŐĐompound. Newly pouredĐonĐƌete Ňoors must Đure for a minimum of 90 days.
Please note it is the person
installing theŇŽor and/or the homeowner’s responsibility to ensure a smooth substrate and that any moisture or alŬalinity issues
are resolved prior to installing theŇŽor. OnĐe installed, it beĐŽmes the installer’s responsibility.