Use and Care Manual

Page 5
120/208 and 120/240 volt ac
single phase, 60 Hz models
Note: This electrical service consists
of 3 current carrying conductors
(Neutral, L1 and L2) and a separate
conductor for earth ground.
L2
N
L1
G
L2 RED
WHITE
GREEN
GREEN
NEUTRAL
L1 BLACK
L2 RED
WHITE
NEUTRAL
L1 BLACK
200, 220 and 240 volt ac
single phase, 60 Hz models
Note: This electrical service
consists of 2 current carrying
conductors (L1 and L2) and a
separate conductor for earth
ground.
ELECTRICAL REQUIREMENTS (cont.)
L2 RED
200 or
230V
GREEN
L1 BLACK
GREEN
35058.2 121814
ELECTRICAL HOOK-UP (Models without power cord)
CAUTION – Improper electrical installation will damage electronic components. Damage caused by incorrect
electrical connections is not covered by warranty.
1. An electrician must provide electrical service as specified in conformance with all local, state and federal electrical
codes.
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3. Remove the front panel beneath the sprayheads to gain access to the terminal block.
4. Feed the cord through the strain relief and connect it to the terminal block. The power cord must be at least 3 feet long
and maxium 6 feet long (measured from strain relief to the attached plug face).
5. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding. Replace the
front panel.
6. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing has been
hooked up, the brewer is ready for Initial Set-Up.
ELECTRICAL HOOK-UP (Models with power cord)
WARNING– If the power cord is ever damaged, it must be replaced by the manufacturer or its service agent with a special
cord available from the manufacturer or its service agent in order to avoid a hazard. Improper electrical installation
will damage electronic components. Damage caused by incorrect electrical connections is not covered by warranty.
1. An electrician must provide electrical service as specified in conformance with all local, state and federal electrical
codes.
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
NOTE - The brewer is shipped without a plug on the power cord. Qualified service personnel must select and install
the proper UL listed grounding type attachment plug specified on the rear of the brewer.
3. Install the specified plug on the attached power cord.
4. Remove the front panel beneath the sprayheads to gain access to the terminal block.
5. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding.
6. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing has
been hooked up, the brewer is ready for Initial Set-Up.
WARNING – Electrical connections must be made as specified above. Failure to follow these instructions can
result in personal injury, property or equipment damage.
RELEASED FOR PRODUCTION
DIR Num: 35058.0002 11, February 2015