Manual

15
Quick installation
Select the measuring range with
switches 4 and 5, see chap. 9.6.
Thread the cables through the
cable glands and make the con-
nections to the electronic board,
see chap. 8.3.
Connect the shield on the
power cable to the earth, see
chap. 8.3.
Fill the pipe.
Energize the device.
Calibrate the flow zero
point, see chap. 9.7.
Install the device on the
pipe.
Calibrate the full scale of
the installation?
Calibrate the full scale, see
chap. 9.8.
Make
sure the fluid
velocity > 2 m/s and
< 10 m/s.
No
yes
Set the relay output parameters,
see chap. 9.9.
yes
No
The 10 bargraph LEDs
go ON?
English
Type 8041