Manual
Table Of Contents

15
Quick installation
→ Select the measuring range with
switches 4 and 5, see chap. 9.6.
→ Thread the cables through the
cable glands and make the con-
nections to the electronic board,
see chap. 8.3.
→ Connect the shield on the
power cable to the earth, see
chap. 8.3.
→ Fill the pipe.
→ Energize the device.
→ Calibrate the flow zero
point, see chap. 9.7.
→ Install the device on the
pipe.
Calibrate the full scale of
the installation?
→ Calibrate the full scale, see
chap. 9.8.
→ Make
sure the fluid
velocity > 2 m/s and
< 10 m/s.
No
yes
→Set the relay output parameters,
see chap. 9.9.
yes
No
The 10 bargraph LEDs
go ON?
English
Type 8041