User guide
22
Electrical installation
Typ 8750
10.2. Electrical installation PROFIBUS DP
Procedure:
→ Connect the process controller according to the following tables.
The electrical connection module of Type 8693 features a setscrew
with nut which is used to connect the Technical Earth (TE)
(see “Fig. 13: Connection with PROFIBUS DP”).
→ Connect setscrew (TE connection) to a suitable grounding point.
To ensure electromagnetic compatibility (EMC), ensure that the
cable is as short as possible (max. 30 cm, Ø 1.5 mm
2
).
When the operating voltage is applied, the process controller is
operating.
→ Now make the required basic settings and actuate automatic
adjustment of the process controller, as described in
Chapter “13. PROFIBUS DP start-up”, page 35.
The settings in the BUS.COMM menu option are described
in Chapter “13. PROFIBUS DP start-up”.
Circular plug M12, 4-pole
Socket M12, 5-pole
Operating voltage
(inversely coded)
(PROFIBUS DP)
TE terminal
1
2
3
4
1
24
3
Pressure sensor P1, P2
Circular plug M8, 4-pole
2
1
4
3
5
Fig. 13: Connection with PROFIBUS DP
Socket M12, 5-pole (bus connection)
Pin Signal
1 VP+5
2 RxD/TxD-N
3 DGND
4 RxD/TxD-N
5 Shielding
Tab. 10: Socket M12, 5-pole (bus connection)
english