ESC Installation, Operating, and Service Instructions
11
4. CONNECT VENTING (continued)
(3) Install vent piping.
(4) When conguring the ESC for Power
Vent (indoor combustion air) install a 45°
vent elbow, pointing downward.
(5) Install vent terminal and seal around all
exterior openings.
(6) The nal installation should appear as in
Figure 4-c.
4. For vertical venting, follow instructions in
Appendix B2 Direct Venting, Special
Instructions for Stainless Steel Venting
Vertical Installations, Specically,
(1) Install re stops and wall thimbles.
(2) Install vent piping and vert terminal.
(3) Install condensate line.
(4) Install roof ashing and roof supports.
(5) The nal installation should appear as in
Figure B-7 in Appendix B-2.
5. Do not use cellular core PVC (ASTM
F891), cellular core CPVC, or Radel
®
(polyphenolsulfone).
6. Do not cover non-metallic vent pipe and
ttings with thermal insulation.
Note: Non-metallic vent cannot be used with
this boiler.
4-c