Install Instructions

10
with additional space(s) of sufcient volume
such that combined volume of all spaces
meet criteria for unconned space. Size each
opening for minimum free area of 1 square
inch per 1,000 BTU per hour input of all
equipment in spaces, but not less than 100
square inches.
6. Louvers and Grilles of Ventilation Ducts
a. All outside openings should be screened and
louvered. Screens used should not be smaller
than 1/4 inch mesh. Louvers will prevent the
entrance of rain and snow.
b. Free area requirements need to consider the
blocking effect of louvers, grilles, or screens
protecting the openings. If the free area of the
louver or grille is not known, assume wood
louvers have 20-25 percent free area and metal
louvers and grilles have 60-75 percent free area.
c. Louvers and grilles must be xed in the open
position, or interlocked with the equipment to
open automatically during equipment operation.
D. DIRECT VENT CONFIGURATIONS requires:
1. Beckett NX Burner
2. Direct Vent Conversion Kit
3. Double Wall Flex Oil Vent Pipe (FOVP)
Boiler
Model
No.
Beckett NX
Oil Burner
Part No.
Direct Vent
Conversion Kit
Part No.
FOVP Carton Part
No.
MPO147 100240-02
102130-02
100211-02 - 5 ft.
100212-02 - 10 ft.
MPO189 100240-03
100213-02 - 15 ft.
100214-02 - 20 ft.
MPO231 100240-04 102130-03
100211-03 - 5 ft.
100212-03 - 10 ft.
100213-03 - 15 ft.
100214-03 - 20 ft.
TABLE 2: DIRECT VENT CONFIGURATION
COMPONENTS