Install Instructions

23
Figure 13: Recommended Piping for Combination
Heating & Cooling
(Refrigeration) System
NOTICE
U.S. Boiler recommends sizing the system

20°F temperature differential in the system. When
sizing the system circulator, the pressure drop of
all radiators, baseboard and radiant tubing and all
connecting piping must be considered.
E. Install circulator with anges, gaskets and bolts
provided. Circulator harness allows circulator to be
mounted on supply or return. Connect harness to
circulator and secure any excess conduit.
F. Install supply manifold, pressure/temperature gauge
and pressure relief valve.
See Figure 12. Pressure Relief Valve must be installed
with spindle in vertical position. Installation of the
relief valve must comply with the ASME Boiler and
Pressure Vessel Code, Section IV.
WARNING
Pressure relief valve discharge piping must be
piped such that the potential of severe burns
is eliminated. DO NOT pipe in any area where
freezing could occur. DO NOT install any shut-off
valves, plugs or caps. Consult Local Codes for
proper discharge piping arrangement.
G. Space heating and domestic water heating with
Alliance SL™ water heater. Install Alliance SL™ water
heater as a separate heating zone. Refer to Alliance
SL™ Installation, Operating and Service Instructions
for additional information.
Figure 12: Supply Water Manifold Piping
IV. WATER PIPING AND TRIM (continued)
H. If boiler is used in connection with refrigeration
systems, boiler must be installed with chilled medium
piped in parallel with the heating boiler using
appropriate valves to prevent chilled medium from
entering boiler, see Figure 13.
I. If boiler is connected to heating coils located in
air handling units where they may be exposed to
refrigerated air, boiler piping must be equipped with
ow control valves to prevent gravity circulation of
boiler water during operation of cooling system.
J. Use a boiler bypass if the boiler is to be operated
in a system which has a large volume or excessive
radiation where low boiler water temperatures may be
encountered (i.e. converted gravity circulation system,
etc.).
Install pipe tee between circulator and boiler return
along with second tee in supply piping as shown in
Figure 14 or 15. Bypass should be same size as the
supply and return lines with valves located in bypass
and supply outlet as illustrated in Figure 14 or 15 in
order to regulate water ow to maintain higher boiler
water temperatures.
After the boiler is operational (reference Section VIII.
System Start-Up) set by-pass and boiler supply valves
to half throttle position to start. Operate boiler until
system water temperature reaches normal operating
range.
Adjust valves to provide 180° to 200°F supply water
temperature. Opening the boiler supply valve will raise
system temperature, while opening the by-pass valve
will lower system supply temperature.
K. After the boiler and system have been cleaned and
ushed, and before relling the entire system add
appropriate water treatment chemicals, if necessary, to
bring the pH between 7 and 11.