IN S TAL L AT ION , OP E R AT IN G AN D S E R V IC E IN S T R U C T ION S F OR S E R IE S 8 B G A S - F I R E D BO I L E R F o r s e rvi c e o r re p a i rs to b o i le r, c a ll yo ur he a ti ng c o ntra c to r. W he n s e e k i ng i nfo rm a ti o n o n b o i le r, p ro vi d e B o i le r M o d e l Num b e r a nd S e ri a l Num b e r a s s ho wn o n Ra ti ng L a b e l.
IMPORTANT INFORMATION - PLEASE READ THIS PAGE CAREFULLY NOTE: The equipment shall be installed in accordance with those installation regulations enforced in the area where the installation is to be made. These regulations shall be carefully followed in all cases. Authorities having jurisdiction shall be consulted before installations are made. All wiring on boilers installed in the USA shall be made in accordance with the National Electrical Code and/or local regulations.
WAR N IN G T h is b o ile r r e q u ir e s r e g u la r m a in te n a n c e a n d s e r v ic e to o p e r a te s a fe ly. F o llo w th e in s t r u c t io n s c o n t a in e d in t h is m a n u a l. Im p r o p e r in s t a lla t io n , a d ju s t m e n t , a lt e r a t io n , s e r v ic e o r m a in t e n a n c e c a n c a u s e p r o p e r t y d a m a g e , p e r s o n a l in ju r y o r lo s s o f lif e .
Table of Contents I. Pre-Installation ................................................ 6 II. Boiler Assembly ................................................ 8 III. Gas Control System Assembly ....................... 15 (Knockdown Boilers) IV. Water Trim and Piping .................................... 27 V. Gas Piping ....................................................... 31 VI. Venting ............................................................ 33 VII. Electrical ............................
Figure 1: Dimensional Data Table 1: Dimensional Data D i me ns i o ns (Inc he s ) B o i le r Mo d e l No . A 805B 20 10 806B 2 3 - 3 /4 807B B D C E Re c o mme nd e d C hi mne y S i ze (Ro und ) Wa te r C o nte nt (Ga llo ns ) A p p ro x. S hi p p i ng We i g ht (L B ) US A C a na d a US A C a na d a 7 2 4 - 1 3 /1 6 2 4 - 1 3 /1 6 1 6 - 1 /8 1 6 - 1 /8 7 " d i a . x 1 5 ft. 11 .9 690 11 -7 /8 8 2 7 - 1 3 /1 6 2 5 - 3 /4 18 16 8 " d i a . x 1 5 ft. 1 3 .
I. Pre-Installation a. Front: 18" b. Top: 36" c. Draft hood, rear, sides and flue connector: 6" WAR N IN G C a r e fu lly r e a d a ll in s t r u c t io n s b e fo r e in s t a llin g b o ile r. F a ilu r e t o fo llo w a ll in s t r u c t io n s in p r o p e r o r d e r c a n c a u s e p e r s o n a l in ju r y o r d e a t h . 2. USA, 808B-810B: for installation in room which is large in comparison with size of boiler. a. Front: 18" b. Top: 51½" c. Draft hood, rear, sides, and flue connector: 6" A.
a. If result is greater than or equal to 50 ft³ per 1,000 Btuh, space is considered an unconfined space. i. b. If result is less than 50 ft³ per 1,000 Btuh, space is considered a confined space. ii. Free area shall not be less than the sum of the areas of all vent connectors in the confined space. 4. Determine building type. A building of unusually tight construction has the following characteristics: Alternate method for boiler located within confined space.
II. Boiler Assembly A. Remove Crate (Semi-Pak and Packaged Only) 1. Remove all fasteners at crate skid. 2. Lift outside container and remove with all other inside protective spacers and bracing. B. Remove boiler from skid. See Figure 2. Exercise care to avoid dropping boiler. 1. Place boiler in approximate location. Refer to Section I: Pre-Installation. Remove base hold down bolts. 2. Using pry bar under rear corner of Base End Panel, raise boiler and install 1½" wood blocks under rear corners.
5. Fill boiler completely with water by venting air through purge valve. Close purge valve and apply water pressure of at least 10 psi but less than 50 psi gauge pressure. 5. Roll boiler until 3" roller is located as shown. Use pry bar to install wood blocks under front corners of base. Remove 3" roller. 6. Lift boiler with pry bar. Remove wood blocks. Lower boiler. 6. Examine boiler for leaks or damage due to shipment or handling. C. For Packaged Boiler only, proceed to Paragraph E. 7.
Figure 5: General Assembly (Knockdown Boilers) I. Install Base Front Panel. See Figure 5. Panel and on three sides (alcove) while maintaining clearances shown in Figure 4. hardware located in Combination Boiler Parts and Control Carton. F. Move boiler to permanent location by sliding or walking. DO NOT DROP. For Packaged Boiler proceed to Section IV: Trim and Piping. 1. Attach Base Front Panel to Section Assembly using ¼" - 20 x 1¼" carriage bolts, washers and nuts. 2.
Figure 6: Flame Roll-out Switch Installation Figure 7: Burner/Burner Access Panel Installation 11
7. Attach Lower Front Tie Bar to Left Side and Right Side Panels. 1. Cut insulation from semicircular notch at right end of the burner access panel. Models 808B - 810B have two (2) burner access panels. Remove insulation from notch of right side burner access panel only. 8. Engage Upper Front Panel in slots on Left Side and Right Side Panels. Place Top Panel in position. Attach Top Panel to Left Side, Right Side and Upper Rear Panels. 2.
Figure 8: Jacket Assembly
Figure 9: EP/OP Control Installation 14
III. Gas Control System Assembly (Knockdown Boilers) C. OP Control System A. 24V Standing Pilot Control System Install Gas Control System. All components are located in Combination Boiler Parts and Control Carton. Install Gas Control System. All components are located in Combination Boiler Parts and Control Carton. 1. Install Gas Control Assembly on Manifold. See Figure 10. Use thread (joint) compound (pipe dope) resistant to action of liquefied petroleum gas. 1.
Panel using four (4) #8 x ½" lg. sheet metal screws. b. Attach transformer/control center to junction box. F. EP-CSD-1 Control System b. Connect Ignition Lead from Pilot to Ignition Transformer. Install Gas Control System. All components are located in Combination Boiler Parts and Control Carton. 4. Mount Transformer (continuous circulation) or Control Center (intermittent circulation) to Junction Box. 1. Install Gas Control Assembly on Manifold. See Figure 19. a.
Figure 10: Schematic Gas Piping, 24V Standing Pilot, 806B & 807B
Figure 11: Main Gas Piping, Intermittent Ignition (EI)
Figure 12: Schematic Pilot Piping (Honeywell EI), USA
Figure 13: Schematic Pilot Piping (Honeywell EI) Canada: Natural Gas, 805B - 810B; LP Gas, 806B - 807B
Figure 14: Schematic Pilot Piping (Johnson EI), USA
Figure 15: Schematic Pilot Piping (Johnson EI) Canada: Natural Gas, 805B - 810B; LP Gas, 806B - 807B
Figure 16: Schematic Gas Piping, OP Control System, 806B - 810B
Figure 17: Schematic Gas Piping, OP-CSD-1 Control System, 808B - 810B
Figure 18: Schematic Gas Piping, EP Control System (Natural Gas Only), 806B - 810B
Figure 19: Schematic Gas Piping, EP-CSD-1 Control System, 808B - 810B
IV. Water Trim and Piping WARNING F a ilu r e t o p r o p e r ly p ip e b o ile r m a y r e s u lt in im p r o p e r o p e r a t io n a n d d a m a g e t o b o ile r o r s tru c tu re . Ox y g e n c o n t a m in a t io n o f b o ile r w a t e r w ill c a u s e c o r r o s io n o f ir o n a n d s t e e l b o ile r c o m p o n e n ts , a n d c a n le a d to b o ile r fa ilu r e .
b. Insert Temperature-Pressure Gauge. Tighten by applying pressure to square shank on back of gauge. DO NOT APPLY PRESSURE ON GAUGE CASE since this may ruin gauge calibration. 2. Alternate Temperature-Pressure Gauge Piping. See Figure 23. a. Install 2 NPT x 10" Nipple into Supply Tapping "A". See Figure 3. b. Install 2 NPT x ¾ NPT x 2 NPT Tee (provided) or 2 NPT x 2 NPT x ¾ NPT Tee (installer furnished). ¾" NPT leg should face forward. c. Install ¾ NPT x ¼ NPT Bushing. d. Insert Temperature-Pressure Gauge.
Figure 23: Alternate Temperature-Pressure Gauge Installation Figure 22: Temperature-Pressure Gauge Installation Figure 24: Recommended Piping for Combination Heating & Cooling (Refrigeration) System 29
Figure 25: Recommended Boiler Piping for Circulator Zoned Heating Systems
V. Gas Piping 4. Specific gravity of gas. Gas piping systems for gas with a specific gravity of 0.70 or less can be sized directly from Table 6, unless authority having jurisdiction specifies a gravity factor be applied. For specific gravity greater than 0.70, apply gravity factor from Table 8. If exact specific gravity is not shown choose next higher value.
Table 6: Maximum Capacity of Schedule 40 Pipe in CFH for Gas Pressures of 0.5 psig or Less 0 .3 i nc h w.c . P r e s s ur e D r o p L e ng th [F e e t] 0 .5 i nc h w.c .
VI. Venting A. Install vent system in accordance with local building top of boiler. On Knocked Down boilers, the assembly is located in Combination Boiler Parts and Control Carton. codes; or local authority having jurisdiction; or National Fuel Gas Code, ANSI Z223.1/NFPA 54, Part 7, Venting of Equipment and/or CAN/CGA B149 Installation Codes, Part 5, Venting Systems and Air Supply for Appliances. Install any of the following for this Series 8B Category I, draft hood equipped appliance: 1.
E. Boiler Equipped With Vent Damper. See Figure 28. 1. Do not connect into same leg of chimney serving an open fireplace. 1. Open Vent Damper Carton and remove Installation Instructions. Read Installation Instructions thoroughly before proceeding. 2. Where two or more appliances vent into a common vent, the area of the common vent should at least equal the area of the largest vent plus 50 % of the area of the additional vents.
9. Design vent system for sea level input. venting system are located and other spaces of the building. Turn on clothes dryers and any appliance not connected to the common venting system. Turn on any exhaust fans, such as range-hoods and bathroom exhausts, so they will operate at maximum speed. Do not operate a summer exhaust fan. Close fireplace dampers. 10. Provide adequate ventilation of Boiler Room. See Section I: Pre-Installation. 11.
VII. Electrical DANGER P o s it iv e ly a s s u r e a ll e le c t r ic a l c o n n e c t io n s a r e u n p o w e r e d b e fo r e a t t e m p t in g in s t a lla t io n o r s e r v ic e o f e le c t r ic a l c o m p o n e n t s o r c o n n e c t io n s o f t h e b o ile r o r b u ild in g . L o c k o u t a ll e le c t r ic a l b o x e s w it h p a d lo c k o n c e p o w e r is t u r n e d o ff.
E. Alliance Water Heater (if used). May be used with through Terminal 2 and the damper motor is deenergized. Intermittent Circulation only. 5. When the call for heat is satisfied, the damper relay coil is de-energized - closing contacts which energize the damper motor. This causes the damper to close. When the damper blade reaches the fully closed position, the damper motor is de-energized. Refer to Alliance Installation, Operating and Service Instructions for wiring, piping and additional information.
Table 10: Sequence of Operation and Wiring Diagrams W i ri ng D i a g ra m F i g ure Ig ni ti o n S ys te m C o untry F ue l US A & C a na d a Na tur a l Ga s Sta nd i ng P i lo t ( OP - - 1 2 0 V ) US A & C a na d a Na tur a l Ga s Sta nd i ng P i lo t ( OP - C S D - 1 - - 1 2 0 V ) US A L P Ga s Sta nd i ng P i lo t ( 2 4 V ) B o i le r S i ze s S e q ue nc e o f Op e r a ti o n C o nti nuo us Inte rm i tte nt 6 & 7 S e c t. F i g ur e 3 1 F i g ur e 3 2 Page 38 6 - 1 0 S e c t.
Figure 31: Wiring Diagram, Standing Pilot (24), USA and Canada, Continuous Circulation 39
Figure 32: Wiring Diagram, Standing Pilot (24V), USA and Canada, Intermittent Circulation 40
3. Electronically Supervised Standing Pilot (OP-CSD-1) Sequence of Operation 2. Electronically Supervised Standing Pilot (OP) Sequence of Operation a. Normal Operation a. Normal Operation i. Thermostat or operating control calls for heat. ii. Terminal #6 of RM7890C Burner Control is energized, initiating a microcomputer monitored circuit test. iii. Pilot Flame Establishing Period (PFEP) begins. iv.
Figure 33: Wiring Diagram, OP/OP-CSD-1 Ignition System, Continuous Circulation 42
Figure 34: Wiring Diagram, OP/OP-CSD-1 Ignition System, Intermittent Circulation 43
excessive flue gas spillage occurs. Circulator continues to operate and Vent Damper (if used) remains open with call for heat. If blocked vent switch is activated do not attempt to place boiler in operation. Correct cause of spillage and reset blocked vent switch. iii. Flame Roll-out switch: Automatically interrupts main burner operation when flames or excessive heat are present in vestibule. Circulator continues to operate, Vent Damper (if used) remains open with call for heat.
Figure 35: Wiring Diagram, Honeywell EI, USA, Continuous Circulation 45
Figure 36: Wiring Diagram, Honeywell EI, USA, Intermittent Circulation 46
Figure 37: Wiring Diagram, Honeywell EI, Canada, Continuous Circulation 47
Figure 38: Wiring Diagram, Honeywell EI, Canada, Intermittent Circulation 48
excessive flue gas spillage occurs. Circulator continues to operate, Vent Damper (if used) remains open with call for heat. If blocked vent switch is activated do not attempt to place boiler in operation. Correct cause of spillage and reset blocked vent switch. iii. Flame Roll-out switch: automatically interrupts main burner operation when flames or excessive heat are present in vestibule. Circulator continues to operate, Vent Damper (if used) remains open with call for heat. Control is single use device.
Figure 39: Wiring Diagram, Johnson EI, USA, Continuous Circulation 50
Figure 40: Wiring Diagram, Johnson EI, USA, Intermittent Circulation 51
Figure 41: Wiring diagram, Johnson EI, Canada, Continuous Circulation 52
Figure 42: Wiring Diagram, Johnson EI, Canada, Intermittent Circulation 53
6. Electronically Supervised Intermittent Ignition (EP/EP-CSD-1) Sequence of Operation call for heat. Normal operation resumes when water temperature falls below set point. ii. Blocked Vent Switch: Automatically interrupts main burner operation when excessive flue gas spillage occurs. Circulator continues to operate with call for heat. If blocked vent switch is activated, do not attempt to place boiler in operation. Correct cause of spillage and reset blocked vent switch. iii.
Figure 43: Wiring Diagram, EP/EP-CSD-1 Ignition System, USA, Continuous Circulation 55
Figure 44: Wiring Diagram, EP/EP-CSD-1 Ignition System, USA, Intermittent Circulation 56
Figure 45: McDonnell & Miller PS-851 (120V) L.W.C.O. Wiring for Boilers with 24V Limit Circuits Figure 46: McDonnell & Miller PS-851 (120V) L.W.C.O.
Figure 47: Hydrolevel OEM - 170/550/650/750 (120V) L.W.C.O. Wiring for Boilers with 24V Limit Circuits Figure 48: Hydrolevel OEM - 170/550/650/750 (120V) L.W.C.O.
VIII. System Start-up At completion, open all zone valves or shut-off valves. 9. Close purge valve, continue filling the system until the pressure gauge reads the desired cold fill pressure. Close fill valve. (Note - If make-up water line is equipped with pressure reducing valve, adjust pressure reducing valve to desired cold fill pressure. Follow fill valve manufacturer’s instructions). 10. Open isolation valve in boiler supply piping. 11. Remove hose from purge valve.
Figure 49: Lighting Instructions (24V Standing Pilot) 60
Figure 50: Operating Instructions (EI) 61
Figure 51: Lighting Instructions (OP) 62
Figure 52: Operating Instructions (EP) 63
B OIL E R OP E RATING INS TRUC TIONS TO S H U T D O W N : 1. C lo s e m a nua l m a i n s hut-o ff va lve ( s ) a nd p i lo t va lve ( s ) . 2. Turn o ff m a i n e le c tri c s wi tc h. TO S TA RT UP : 1. M a k e s ure tha t b o th the m a i n m a nua l a nd the p i lo t va lve ( s ) ha ve b e e n o ff fo r a t le a s t fi ve m i nute s . 2. Turn ro o m the rm o s ta t a nd a ll o p e ra ti ng c o ntro ls to lo we s t s e tti ng . 3. Re m o ve b urne r a c c e s s p a ne l( s ) . 4.
Figure 54: Honeywell Q314 Pilot Flame (24V Standing Pilot) Figure 57: Honeywell Q179D Pilot Flame (OP) Figure 55: Honeywell Q348 Pilot Flame (24V Electronic Ignition) Figure 58: Honeywell Q179C Pilot Flame (EP) I. Check pilot burner flame and main burner flames through observation port. 1. Check pilot flame. Refer to Table 11 for appropriate pilot detail. 2. Adjust thermostat to highest setting. 3. Check main burner flames. See Figure 59.
CAUTION Av o id o p e ra tin g th is b o ile r in a n e n v iro n me n t w h e r e s a w d u s t , lo o s e in s u la t io n f ib e r s , d r y w a ll d u s t , e t c . a r e p r e s e n t . If b o ile r is o p e r a t e d u n d e r t h e s e c o n d it io n s , t h e b u r n e r in t e r io r a n d p o r t s m u s t b e c le a n e d a n d in s p e c t e d d a ily t o in s u r e p r o p e r o p e r a t io n . Yellow-tipping indicates lack of primary air.
b. Increase input rate if less than 98% of rating plate input. Increase manifold gas pressure no more than 0.3 inch w.c. If measured input rate is still less than 98% of rated input: i. Remove Main Burners per procedure in Section IX: Service. Table 12: Input Rate S i ze o f Ga s M e te r D i a l S e c o nd s fo r One One -Ha lf One Two F i ve Re vo luti o n C u. F t. C u. F t. C u. F t. C u. F t. ii. Remove gas orifices. Drill one (1) drill size larger (drill size is stamped on orifice, or see Key No.
IX. Service WAR N IN G S e r v ic e o n t h is b o ile r s h o u ld b e u n d e r t a k e n o n ly b y t r a in e d a n d s k ille d p e r s o n n e l fr o m a q u a lifie d s e r v ic e a g e n c y. In s p e c tio n s s h o u ld b e p e r fo r m e d a t in te r v a ls s p e c ifie d in th is m a n u a l. M a in t a in m a n u a l in a le g ib le c o n d it io n .
Im p o r t a n t P r o d u c t S a fe t y In fo r m a t io n R e fr a c t o r y C e r a m ic F ib e r P r o d u c t Warning: This product contains refractory ceramic fibers (RCF). RCF has been classified as a possible human carcinogen. After this product is fired, RCF may, when exposed to extremely high temperature (>1800F), change into a known human carcinogen. When disturbed as a result of servicing or repair, RCF becomes airborne and, if inhaled, may be hazardous to your health.
Figure 60: Boiler Flueway Cleaning F. Clean Combustion Chamber by vacuuming. Exercise Table 13: Pilot Burner Location care to avoid damaging Base Insulation. G. Install Burners by reversing procedures used to remove burners. Verify Main Burners are properly located on support bracket in Base Rear Panel, seated on Main Burner Orifices, and secured with hitch pin clips. Verify Main Burner with Pilot Bracket is in proper location. See Table 13. H. Lubrication.
Honeywell EI Trouble Shooting Guide 71
Johnson EI Trouble Shooting Guide 72
SERVICE RECORD DATE SERVICE PERFORMED 74
SERVICE RECORD DATE SERVICE PERFORMED X. Repair Parts All Series 8B Repair Parts may be obtained through your local Burnham Wholesale distributor. Should you require assistance in locating a Burnham Distributor in your area, or have questions regarding the availability of Burnham products or repair parts, please contact Burnham Customer Service at (717) 481-8400 or Fax (717) 481-8408.
Ite m D e s c r i p ti o n No . Qua nti ty P a rt No . 805B 806B 807B 808B 809B 810B 6171605 1 --- --- --- --- --- 6171606 --- 1 --- --- --- --- 6171607 --- --- 1 --- --- --- 6171608 --- --- --- 1 --- --- 6171609 --- --- --- --- 1 --- 6171610 --- --- --- --- --- 1 1 .
Ite m D e s c r i p ti o n No . P a rt No . Qua nti ty 805B 806B 807B 808B 809B 810B 6 111 6 0 5 1 ---- ---- ---- ---- ---- 6 111 6 0 6 ---- 1 ---- ---- ---- ---- 6 111 6 0 7 ---- ---- 1 ---- ---- ---- 6 111 6 0 8 ---- ---- ---- 1 ---- ---- 6 111 6 0 9 ---- ---- ---- ---- 1 ---- 6 111 6 1 0 ---- ---- ---- ---- ---- 1 2.
Ite m D e s c r i p ti o n No . P a r t No .
Ite m D e s c r i p ti o n No . P a r t No . Qua nti ty 805B 806B 807B 808B 809B 810B 4 .
ITE M NO .
ITE M NO .
ITE M NO .
ITE M NO .
ITE M NO . D E S C RIP TION PA R T N U M B E R QUA NTITY 5 - 5 G a s Tr a i n - I n t e r m i t t e n t I g n i t i o n ( E P - C S D - 1 ) U S A On ly, 8 - 1 0 S e c tio n , N a tu r a l Ga s On ly A Ga s Va lve , Ro b e r ts ha w 7 0 0 0 GV E RHC - S 7 C , Na t.
ITE M NO . PA R T NUM B E R D E S C RIP TION S IZE QUA NTITY A ll 1 5 - 6 P i l o t As s e m b l y a n d P i p i n g - - S t a n d i n g P i l o t ( 2 4 V ) U S A & C a n a d a : 6 & 7 S e c t io n , N a t u r a l a n d L P Ga s P i lo t B ur ne r, Ho ne ywe ll Q3 1 4 A 3 6 8 7 , Na tur a l Ga s 8236033 P i lo t B ur ne r, Ho ne ywe ll Q3 1 4 A 3 8 2 8 , L P Ga s 8236034 B The r m o c o up le , Ho ne ywe ll Q3 0 9 A 1 9 9 6 w/3 6 " L g .
ITE M NO . PA R T NUM B E R D E S C RIP TION S IZE QUA NTITY 5 - 7 P i l o t As s e m b l y a n d P i p i n g - I n t e r m i t t e n t I g n i t i o n ( H o n e y w e l l E I ) U S A 5 - 1 0 S e c t io n , N a t u r a l a n d L P Ga s P i lo t B ur ne r, Ho ne ywe ll Q3 4 8 A 1 0 0 2 , Na tur a l Ga s 8236072U A 1 P i lo t B ur ne r, Ho ne ywe ll Q3 4 8 A 1 0 1 0 , L P Ga s 8236081 B Ig ni te r /S e ns o r C a b le , 3 6 " L g .
ITE M NO . PA R T NUM B E R D E S C RIP TION S IZE QUA NTITY 5 - 8 P i l o t As s e m b l y a n d P i p i n g - - I n t e r m i t t e n t I g n i t i o n ( H o n e y w e l l E I ) C a n a d a 5 - 1 0 S e c t io n , N a t u r a l Ga s 5 - 7 S e c t io n , L P Ga s P i lo t B ur ne r, Ho ne ywe ll Q3 4 8 A 1 0 0 2 , Na tur a l Ga s 8236072U 8 0 5 B -8 1 0 B P i lo t B ur ne r, Ho ne ywe ll Q3 4 8 A 1 0 1 0 , L P Ga s 8236081 8 0 5 B -8 0 7 B B Ig ni te r /S e ns o r C a b le , 3 6 " L g .
ITE M NO .
ITE M NO .
ITE M NO . PA R T NUM B E R D E S C RIP TION S IZE QUA NTITY 5 -11 P ilo t As s e m b ly a n d P ip in g -- S ta n d in g P ilo t (OP ) U S A & C a n a d a : 6 - 1 0 S e c t io n , N a t u r a l a n d L P Ga s P i lo t B ur ne r, Ho ne ywe ll Q1 7 9 D 1 0 0 8 , Na tur a l Ga s 8236025 P i lo t B ur ne r, Ho ne ywe ll Q1 7 9 D 1 0 0 8 w/3 8 8 1 4 6 K D Or i fi c e , L P Ga s 6236039 B The r m o c o up le , Ho ne ywe ll Q3 0 9 A 1 9 9 6 w/3 6 " L g .
ITE M NO . PA R T NUM B E R D E S C RIP TION S IZE QUA NTITY 5 - 1 2 P i l o t As s e m b l y a n d P i p i n g - - S t a n d i n g P i l o t ( O P - C S D - 1 ) U S A On ly : 8 - 1 0 S e c t io n , L P Ga s On ly A P i lo t B ur ne r, Ho ne ywe ll Q1 7 9 D 1 0 0 8 w/3 8 8 1 4 6 K D Or i fi c e , L P Ga s 6236039 1 B The r m o c o up le , Ho ne ywe ll Q3 0 9 A 1 9 9 6 w/3 6 " L g . L e a d 8236004 1 C F la m e Ro d L e a d , Ho ne ywe ll R1 2 9 8 0 2 0 , 4 ft. L g .
ITE M NO . PA R T NUM B E R D E S C RIP TION S IZE QUA NTITY 5 - 1 3 P i l o t As s e m b l y a n d P i p i n g - - I n t e r m i t t e n t I g n i t i o n ( E P ) U S A & C a n a d a : 6 - 1 0 S e c t io n , N a t u r a l Ga s On ly A P i lo t B ur ne r, Ho ne ywe ll Q1 7 9 C 1 0 0 9 , Na tur a l Ga s 8236017 1 B F la m e Ro d L e a d , Ho ne ywe ll R1 2 9 8 0 2 0 , 4 ft. L g .
ITE M NO . PA R T NUM B E R D E S C RIP TION S IZE QUA NTITY 5 - 1 4 P i l o t As s e m b l y a n d P i p i n g - - I n t e r m i t t e n t I g n i t i o n ( E P - C S D - 1 ) U S A On ly : 1 0 S e c t io n , N a t u r a l Ga s On ly A P i lo t B ur ne r, Ho ne ywe ll Q1 7 9 C 1 0 0 9 , Na tur a l Ga s 8236017 1 B F la m e Ro d L e a d , Ho ne ywe ll R1 2 9 8 0 2 0 , 4 F t. L g .
Ite m D e s c r i p ti o n No . Qua nti ty P a rt No .
Ite m D e s c r i p ti o n No . Qua nti ty P a r t No . 805B 806B 807B 808B 809B 810B 6 .
Ite m D e s c r i p ti o n No . P a r t No . Qua nti ty 805B 806B 807B 808B 809B 810B 7 . Tr i m a n d M i s c e l l a n e o u s C o n t r o l s A L i m i t, 1 4 0 - 2 2 0 °F, Ho ne ywe ll L 4 0 8 0 D 1 2 1 8 ( E I & Sta nd i ng P i lo t) ; L 4 0 8 0 B 1 2 1 2 ( ( E P & OP ) 80160251 80160474 1 1 1 1 1 1 Im m e r s i o n W e ll, ¾" NP T x 1 ½" Ins ul.
Ite m D e s c r i p ti o n No . P a r t No . Qua nti ty 805B 806B 807B 808B 809B 810B 8 111 6 0 5 1 --- --- --- --- --- 8 111 6 0 4 --- 1* --- --- --- --- 8 111 6 0 7 --- 1 ** --- --- --- --- 8 111 6 0 3 --- --- 1* --- --- --- 8 111 6 0 8 --- --- 1 ** --- --- --- 8 .
Ten Year Limited Warranty COMMERCIAL CAST IRON BOILERS — SERIES 5B, 8B, V9 and V11 Burnham Commercial™ hereby warrants to the original owner (“Owner”) of each Series 5B, 8B, V9, and V11 commercial cast iron boiler ( a “Boiler”) manufactured by Burnham Commercial, as follows: parts and accessories manufactured by others are not covered by these warranties and will be subject only to the manufacturer’s warranty, if any. b.) Improper Installation.