Installation and Operation Manual

58
9. Install Canopy. See Section II: Boiler Assembly,
Paragraph G.
10. Install Jacket Top Panel, Draft Hood, Vent Damper
(if used) and Vent System.
F. Clean Combustion Chamber by vacuuming. Exercise
care to avoid damaging Base Insulation.
G. Install Burners by reversing procedures used to
remove burners. Verify Main Burners are properly
located on support bracket in Base Rear Panel, seated
on Main Burner Oriî‚¿ces, and secured with hitch pin
clips. Verify Main Burner with Pilot Bracket is in
proper location. See Table 13.
H. Lubrication. Manufacturers Instruction should be
followed on all parts installed on boiler requiring
Boiler Model Pilot Located Between Burners*
805H 4 & 5
806H 5 & 6
807HE 6 & 7
808HE 6 & 7
809HE 7 & 8
810HE 8 & 9
* Burners numbered left to right as viewed from front of boiler.
Table 13: Pilot Burner Location
Figure 48: Boiler Flueway Cleaning
lubrication. This includes type of lubricant to be used,
frequency of lubrication, and points to lubricate.
I. Check operation. Refer to Section VIII: System Start-
up.