User's Manual

9
Figure 7: Typical Vent System Installations
Figure 8: 24-Volt Continuous Ignition System,
Honeywell Q314 Pilot Flame
A. General Housekeeping (Continuous).
1. Keep boiler area clear and free of combustible
materials and obstructions to the free ow of
combustion and ventilation air to the boiler.
2. Do not store or use gasoline or other ammable
vapors or liquids in the vicinity of the boiler or any
other appliance.
3. Do not store or use sources of hydrocarbons in
the vicinity of the boiler. Sources of hydrocarbons
include bleaches, cleaners, chemicals, sprays, paint
removers, fabric softeners, cat litter and refrigerants.
B. Inspect Vent System (Monthly). See Figure 7. Follow
instructions TO TURN OFF GAS TO APPLIANCE
(see Figures 4 thru 6) and contact a qualied service
agency if any of the following conditions are found:
1. Collapsed vent pipe
2. Disconnected or loose joints
3. Sags in horizontal runs
4. Corrosion or other deterioration
5. Broken or loose supports
6. Blocked vent switch not attached to draft hood.
C. Inspect Pilot and Main Burner Flame (Monthly).
1. Adjust thermostat to lowest setting.
2. Remove front removable panel. See Figure 3.
3. Adjust thermostat to highest setting.
4. Check pilot burner ame through observation port.
See Figures 8 through 11 for appropriate pilot burner
illustration. The center ame should be steady,
medium hard blue enveloping 3/8 to 1/2 inch of
thermocouple. If ames are yellow and lazy, follow
instructions TO TURN OFF GAS TO APPLIANCE
(see appropriate Figure as listed in Table 1) and
contact qualied service agency.
5. Check main burner ames through observation port.
See Figure 11. Flame should have clearly dened
inner cones with no yellow tipping. Orange-yellow
streaks caused by dust should not be confused with
true yellow tipping. If yellow ames are observed,
follow instructions TO TURN OFF GAS TO
APPLIANCE (see appropriate gure as listed in
Table 1) and contact qualied service agency.
6. Adjust thermostat to normal setting.
D. Schedule Inspection by Qualied Service Agency
(Annual or at Beginning of Heating Season). For
continued safe operation a qualied service agency
must provide a more detailed inspection of burners, heat
exchanger and vent system, and provide maintenance
as specied in Installation, Operating and Service
Instructions.
User Maintenance
Service on this boiler should be undertaken only by trained and skilled personnel from a qualied service
agency. Inspections should be performed at intervals specied in Installation, Operating and Service
Instructions and this manual. Maintain manuals in a legible condition.
Keep boiler area clear and free of combustible materials, gasoline and other ammable vapors and liquids.
Do not place any obstructions in boiler room that will hinder ow of combustion and ventilation air.