Alpine Installation, Operating, and Service Instructions

103448-10 - 6/18 29
IV. Venting B. CPVC/PVC Venting (continued)
WARNING
Asphyxiation Hazard. Models ALP080B through ALP210B (floor mounted) and ALP285B
only: Apply supplied dielectric grease to gasket inside vent section of two-pipe vent connector. Failure to
apply the grease could result in flue gas leaks from gasket rupture during vent pipe installation or gasket
deterioration due to condensate exposure.
Table 7A: CPVC/PVC Vent & Air Intake Components Included With Boiler
Vent & Air Intake Components
Part
Number
Quantity
ALP080B & ALP105B Standard
Termination Vent Kits Include
ALP150B & ALP210B Standard
Termination Vent Kits Include
ALP285B Standard
Termination Vent
Kit Includes
Floor Mount Builds
(P/N 106664-01)
Wall Mount Builds
(P/N: 106665-01)
Floor Mount Builds
(P/N 106676-01)
Wall Mount Builds
(P/N 106674-01)
Floor Mount Builds
(P/N 106677-01)
2” Schedule 40 PVC Coupling (Vent Terminal) 101870-01 1 1 N/A N/A N/A
3” Schedule 40 PVC Coupling (Vent Terminal) 106680-01 N/A N/A 1 1 N/A
4” Schedule 40 PVC Coupling (Vent Terminal) 106681-01 N/A N/A N/A N/A 1
2” Schedule 40 PVC 90 Elbow
(Air Intake Terminal)
106618-01 1 1 N/A N/A N/A
3” Schedule 40 PVC 90 Elbow
(Air Intake Terminal)
106678-01 N/A N/A 1 1 N/A
4” Schedule 40 PVC 90 Elbow
(Air Intake Terminal)
106679-01 N/A N/A N/A N/A 1
2” Stainless Steel Rodent Screen 102191-04 2 2 N/A N/A N/A
3” Stainless Steel Rodent Screen 102191-01 N/A N/A 2 2 N/A
4” Stainless Steel Rodent Screen 102191-02 N/A N/A N/A N/A 2
3” x 30” Schedule 40 CPVC Pipe 102193-01 1 N/A 1 N/A N/A
4” x 30” Schedule 40 CPVC Pipe 102193-02 N/A N/A N/A N/A 1
3” Schedule 80 CPVC 90 Elbow 102192-01 1 N/A 1 N/A N/A
4” Schedule 80 CPVC 90 Elbow 102192-02 N/A N/A N/A N/A 1
3” Vent/3” Combustion Air CPVC/
PVC Connector with Flue Temperature
Sensor and Sensor Cap
105133-01 1 N/A 1 N/A N/A
4” Vent/4” Combustion Air CPVC/
PVC Connector with Flue Temperature
Sensor and Sensor Cap
105133-03 N/A N/A N/A N/A 1
3” Vent/3” Combustion Air CPVC/
PVC Connector Gasket
102185-01 1 N/A 1 N/A N/A
4” Vent/4” Combustion Air CPVC/
PVC Connector Gasket
102185-02 N/A N/A N/A N/A 1
Access Panel Assembly 102985-01 N/A 1 N/A 1 N/A
Wall Mounting Template 102986-01 N/A 1 N/A 1 N/A
#8 X 1/2” Tapping Screw 80860061 N/A 4 N/A 4 N/A
Vent Components
Part
Number
Quantity
ALP080B & ALP105B
Horizontal (Snorkel)
Termination
ALP150B & ALP210B
Horizontal (Snorkel)
Termination
ALP285B
Horizontal (Snorkel)
Termination
2 in. Schedule 40 PVC Pipe x up to 7 ft. max. vertical run
N/A
Supplied
by
Others
2 N/A N/A
3 in. Schedule 40 PVC Pipe x up to 7 ft. max. vertical run N/A 2 N/A
4 in. Schedule 40 PVC Pipe x up to 7 ft. max. vertical run N/A N/A 2
2 in. Schedule 40 PVC 90° Elbow 4 N/A N/A
3 in. Schedule 40 PVC 90° Elbow N/A 4 N/A
4 in. Schedule 40 PVC 90° Elbow N/A N/A 4
2 in. Schedule 40 PVC Pipe x ½ ft. min. horizontal run 2 N/A N/A
3 in. Schedule 40 PVC Pipe x ½ ft. min. horizontal run N/A 2 N/A
4 in. Schedule 40 PVC Pipe x ½ ft. min. horizontal run N/A N/A 2
Table 7B: CPVC/PVC Vent & Air Intake Components (Installer Provided) Required for Optional Horizontal
(Snorkel) Termination