Install Instructions
103448-08 - 9/16 29
IV. Venting B. CPVC/PVC Venting (continued)
Vent & Air Intake Components
Part
Number
Quantity
ALP080B & ALP105B
Standard Termination
Vent Kit
(P/N 106664-01)
includes
ALP150B & ALP210B
Standard Termination
Vent Kit
(P/N 106676-01)
includes
ALP285B
Standard Termination
Vent Kit
(P/N 106677-01)
includes
2” Schedule 40 PVC Coupling (Vent Terminal) 106617-01 1 N/A N/A
3” Schedule 40 PVC Coupling (Vent Terminal) 106680-01 N/A 1 N/A
4” Schedule 40 PVC Coupling (Vent Terminal) 106681-01 N/A N/A 1
2” Schedule 40 PVC 90° Elbow
(Air Intake Terminal)
106618-01 1 N/A N/A
3” Schedule 40 PVC 90° Elbow
(Air Intake Terminal)
106678-01 N/A 1 N/A
4” Schedule 40 PVC 90° Elbow
(Air Intake Terminal)
106679-01 N/A N/A 1
2” Stainless Steel Rodent Screen 102191-04 2 N/A N/A
3” Stainless Steel Rodent Screen 102191-01 N/A 2 N/A
4” Stainless Steel Rodent Screen 102191-02 N/A N/A 2
3” x 30” Schedule 40 CPVC Pipe 102193-01 1 1 N/A
4” x 30” Schedule 40 CPVC Pipe 102193-02 N/A N/A 1
3” Schedule 80 CPVC 90° Elbow 102192-01 1 1 1
4” Schedule 80 CPVC 90° Elbow 102192-02 N/A N/A 1
3" Vent/3" Combustion Air CPVC/PVC Connector
with Flue Temperature Sensor and Sensor Cap
105133-01 1 N/A N/A
4" Vent/4" Combustion Air CPVC/PVC Connector
with Flue Temperature Sensor and Sensor Cap
105133-03 N/A N/A 1
3" Vent/3" Combustion Air CPVC/PVC
Connector Gasket
102185-01 1 N/A N/A
4" Vent/4" Combustion Air CPVC/PVC
Connector Gasket
102185-02 N/A 1 1
Table 7A: CPVC/PVC Vent & Air Intake Components Included With Boiler
WARNING
Asphyxiation Hazard. Models ALP080B through ALP210B (oor mounted) and ALP285B only: Apply
supplied dielectric grease to gasket inside vent section of two-pipe vent connector. Failure to apply
the grease could result in ue gas leaks from gasket rupture during vent pipe installation or gasket
deterioration due to condensate exposure.
Vent Components
Part
Number
Quantity
ALP080B &
ALP105B
Horizontal (Snorkel)
Termination
ALP150B &
ALP210B
Horizontal (Snorkel)
Termination
ALP285B
Horizontal
(Snorkel)
Termination
2 in. Schedule 40 PVC Pipe x up to 7 ft. max. vertical run
N/A
Supplied
by
Others
2 N/A N/A
3 in. Schedule 40 PVC Pipe x up to 7 ft. max. vertical run N/A 2 N/A
4 in. Schedule 40 PVC Pipe x up to 7 ft. max. vertical run N/A N/A 2
2 in. Schedule 40 PVC 90° Elbow 4 N/A N/A
3 in. Schedule 40 PVC 90° Elbow N/A 4 N/A
4 in. Schedule 40 PVC 90° Elbow N/A N/A 4
2 in. Schedule 40 PVC Pipe x ½ ft. min. horizontal run 2 N/A N/A
3 in. Schedule 40 PVC Pipe x ½ ft. min. horizontal run N/A 2 N/A
4 in. Schedule 40 PVC Pipe x ½ ft. min. horizontal run N/A N/A 2
Table 7B: CPVC/PVC Vent & Air Intake Components (Installer Provided) Required for Optional Horizontal
(Snorkel) Termination