Install Instructions

106 103448-02 - 6/13
“Press”
Contractor
Setup
button to access the following parameters:
X. Operation G. Changing Adjustable Parameters (continued)
Factory Setting Range / Choices Parameter and Description
Contractor Name User dened Contractor Name
Address Line 1 User dened Contractor Address Line 1
Address Line 2 User dened Contractor Address Line 2
Phone User dened Contractor Phone
“Press”
Manual
Control
button to access the following screen:
The Manual Speed Control speed screen allows the technician to set ring rate at low or high speed for combustion testing.
Status Auto
0 RPM 0%
press to change mode
High
Auto
Low
NOTE
Selecting “Low” or “High”
locks (manual mode) firing
rate at min or max Rate %.
After combustion testing select
“Auto” to return the boiler to
normal operation.
Press “Auto”
to return
firing rate to
Automatic
Mode
“Press” “Low” to select
manual firing rate control
and Minimum firing rate %
Manual Speed Control
i
“Press” “High” to select
manual firing rate control
and Central Heat
Maximum firing rate %
Use Up and DOWN Arrows for More
Exit Screen without Saving
Clear Entire Field
Backspace
Save Field and Exit
Save
Press box to input contractor information.
Contractor Name
<
>
i
Bill Smith
1
7
6
5
4
3
2
A
ES
C
D
C
B
8
CL
R
7
BS
8
Enter Contractor Information
Bill Smith
Press SAVE button to store revisions.
For Service Contact:
Bill Smith
12 Victory Lane
Plainview, New York
516 123-4567
Example Screen