Install Instructions

103448-02 - 6/13 131
Figure
Number
Page
Number
Description
Section I - Product Description, Specications & Dimensional Data
Figure 1A 7 Models ALP080B thru ALP210B (Floor Mounted)
Figure 1B 8 Models ALP080B thru ALP210B (Wall Mounted)
Figure 1C 9 Models ALP285B thru ALP399 (Floor Mounted Only)
Section III - Pre-Installation & Boiler Mounting
Figure 2A 14 Clearances To Combustible and Non-combustible Material, Floor Standing
Figure 2B 14 Clearances To Combustible and Non-combustible Material, Wall Mounted
Figure 2C 15 Wall Mounting Hole Location / Layout
Figure 2D 16 Bottom Mounting Bracket Installation / Boiler Wall Mounting
Figure 2E 16 Access Panel & Gasket Installation
Figure 3 18 Stacking Boiler Attachment Bracket Placement
Section IV - Venting
Figure 4 21
Location of Vent Terminal Relative to Windows, Doors, Grades, Overhangs, Meters and Forced Air
Inlets (Concentric Terminal Shown - Two-Pipe System Vent Terminal to be installed in same location
Two-Pipe System Air Intake Terminal Not Shown)
Figure 5 25 Expansion Loop and Offset
Figure 6 25 Field Installation of CPVC/PVC Two-Pipe Vent System Connector - Floor Mounted Boiler Builds
Figure 7A 27 Near-Boiler Vent/Combustion Air Piping - Floor Mounted Boiler Builds
Figure 7B 27 Field Installation of CPVC Vent Pipe - Wall Mounted Boiler Builds
Figure 8 28 Wall Penetration Clearances For PVC Vent Pipe
Figure 9A 28 Direct Vent - Sidewall Terminations
Figure 9B 29 Direct Vent - Sidewall Terminations (Optional)
Figure 10 29 Rodent Screen Installation
Figure 11 29 Direct Vent - Optional Sidewall Snorkel Terminations
Figure 12 30 Direct Vent - Vertical Terminations
Figure 13 30 Direct Vent - Vertical Terminations w/ Sloped Roof
Figure 14 32 Vent System Field Modication to Install PVC to PP Adapter, M&G/DuraVent
Figure 15 33 Field Installation Procedure to Accept Polypropylene Vent Piping - Wall Mounted Boiler
Figure 16 35 Flexible Vent in Masonry Chimney with Separate Air Intake
Figure 17 37 Field Installation of Two-Pipe Vent System Adapter for Stainless Steel
Figure 18 40 Field Installation of Boiler Concentric Vent Collar
Figure 19 41 Cut-To-Length Extension (Cuttable)
Figure 20 41 Fixed Extension (Non-Cuttable)
Figure 21 41 Cutting Straight Pipe
Figure 22 41 Joining Cuttable Pipe
Figure 23 41 Joining Non-Cuttable Pipe
Figure 24 42 Horizontal Concentric Venting
Figure 25 42 Dimension “L”
Figure 26 43 Cutting Vent Terminal Pipe
Figure 27 43 Completing Horizontal (Wall Terminal Installation)
Figure 28 45 Vertical Concentric Vent Installation
Figure 29 45 Dimension “H”
Appendix A - Figures