Install Instructions

103448-02 - 6/13 57
Figure 37: Near Boiler Piping - Heating Only
VI. Water Piping and Trim C. Standard Installation Requirements (continued)
CAUTION
It is the installers responsibility to select pumps
and boiler piping congurations that provide the
proper ow rates and performance for the boiler
and indirect water heater.
Refer to Table 17 for recommended Boiler Loop
Circulator.