Install Instructions

108
107750-01 - 9/17
3. Status Screens
Boiler Status screens are the primary boiler monitoring screens. The user may simply “walk” though boiler operation
by repeatedly selecting the right or left “arrow” symbol. These screens are accessed by selected the “Status” button
from the “Home” screen.
XII. Operation E. Boiler Sequence Of Operation (continued)
Figure 12.6: Status Screens
Figure 12.7: Boiler Status Screen Denitions
NOTE
Only visible if Zone Panel is
connected. Zone Panel 1 and 2
shown typical for 1 through 4.