Figure 16: Vertical Vent Installation
b.  Secure to vertical vent tee with hose clamp or 
plastic cable tie.
c.  Run condensate drain line to fl oor drain or 
condensate pump. Condensate disposal must be 
acceptable to authority having jurisdiction.
3.  Slope horizontal runs minimum ¼ inch per foot. 
Slope toward vertical vent drain tee. Position weld 
seams in vent pipes in all horizontal runs at the top 
to avoid condensate from lying on the seams.
4. Install fi restops at fl oor and ceiling where vent 
passes through fl oor, ceiling, or framed wall. The 
fi restop must close the fl oor or ceiling opening 
between vent pipe and structure. Firestop 
manufacturers are Air-Jet, American Metal Products, 
Metal-Fab, and Simpson Dura-Vent.
5.  Enclose vent passing through unoccupied or 
occupied spaces above the appliance with materials 
having a fi re resistance rating at least equal to the 
rating of adjoining fl oor or ceiling. Maintain 5 inch 
minimum clearance to combustible materials. Note:  
For one-or two-family dwellings fi re resistance 
rating requirement may not need to be met, but is 
recommended.
Figure 17: Attic Offset
Figure 18: Vertical Vent Termination
Figure 19: Vertical Air Intake Termination
6.  Whenever possible install vent straight through roof.  
Refer to Figure 17 if offset is necessary. Maintain 5 
inch minimum clearance to combustible materials.
7.  Install Vent Terminal. See Figure 18.
a.  Locate roof opening to allow vertical vent 
penetration. Size opening to maintain 5 inch 
minimum clearance from combustible materials.
b.  Vertical venting requires use of roof fl ashing 
(available from Burnham - P/N 8116250) and 
storm collar (available from Burnham - P/N 
8116251) to prevent moisture from entering the 
structure.
c.  Extend vent pipe to maintain minimum vertical 
and horizontal distance of 12 inches from roof 
surface. Allow additional vertical distance for 
expected snow accumulation. Provide brace as 
required. Refer to Figure 18.
d.  Install storm collar on vent pipe immediately 
above roof fl ashing. Apply Dow Corning 
Silastic 732 RTV Sealant between vent pipe and 
storm collar to provide weathertight seal..
e. Attach Vent Terminal.
J.  Install Air Intake Pipe.
1.  Locate air intake termination on the same wall or 
roof location as the vent termination if possible, to 
prevent nuisance boiler shutdowns. However, boiler 
Extend Vent/Air Intake Piping to maintain minimum vertical ("X") and minimum horizontal ("Y") distance 
of twelve (12) inches from roof surface. Allow additional vertical ("X") distance for expected snow 