Operating instructions
15
Figure 22: Securing Draft Hood to Canopy
A. Remove crate and move boiler to permanent position as
detailed in Section III: Semi-Pak Boiler Assembly.
B. Remove Jacket Front Panel. See Figure 50.
C. Remove poly bag from vestibule area.
D. Install Jacket Front Panel.
E. Install Draft Hood. Models IN3 through IN9.
1. Locate and open "Rear Draft Hood Carton".
2. Position Draft Hood on Canopy Rear Flange. See
Figure 21. Top canopy flange must fully engage
"U"-shaped draft hood flange for proper installation
and operation. Care must be taken to assure that
draft hood is level.
IV. Packaged Boiler Assembly
Figure 21: Draft Hood Attachment
3. Secure Rear Draft Hood to Canopy with wing nuts
provided. See Figure 22.
WARNING
Do not alter boiler draft hood or place any
obstruction or non-approved damper in the
breeching or vent system. Flue gas
spillage can occur. ETL/ETLC certification
will become void.
WARNING
Installation of this boiler should be
undertaken only by trained and skilled
personnel from a qualified service agency.