Independence Installation, Operating, and Service Instructions

69
103538-08 - 3/18
Appendix B - Figures
Figure
Number
Page
Number
Description
Figure 1 4 Dimensional Drawing
Figure 2 6 Section Tappings
Section I - Pre-Installation
Figure 3 8 Clearance to Combustible Materials
Section II - Knocked-Down Boiler Assembly
Figure 4 10 Base Gasket Installation
Figure 5 10 Section Assembly Attachment
Figure 6 10 Hydrostatic Pressure Test
Figure 7 11 Canopy Gasket Installation
Figure 8 11 Canopy Installation
Figure 9 11 Jacket Assembly
Figure 10 12 Combustion Chamber
Figure 11 12 Pilot and Gas Piping, Continuous Ignition (Standing Pilot) (IN10 through IN12 Only)
Figure 12 12 Pilot and Gas Piping, Intermittent Ignition (EI) (IN3I through IN11 Only)
Figure 13 12 Pilot and Gas Piping, Intermittent Ignition (EI) (IN12 Only)
Figure 14 13 Blocked Vent Switch Installation, IN3I through IN9I
Figure 15 13 Blocked Vent Switch Installation, IN10 through IN12
Section III - Semi-Pak Boiler Assembly
Figure 16 14 L404F Pressure Limit Control
Figure 17A 15 Junction Box and Mounting Bracket Assembly
Figure 17B 15 Junction Box and Transformer Assembly
Figure 18 15 Thermostat Isolation Relay Attachment
Section IV - Packaged Boiler Assembly
Figure 19 16 Draft Hood Attachment
Figure 20 16 Securing Draft Hood to Canopy
Section V - Piping and Trim
Figure 21 17 Trim Installation
Figure 22 18 Steam Boiler Piping (Minimum)
Figure 23 19 Recommended Piping for Combination Heating and Cooling (Refrigeration) Systems
Figure 24 19 Recommended Piping for Indirect Water Heater
Figure 25 19 Tankless Heater Piping
Section VI - Gas Piping
Figure 26 21 Recommended Gas Piping
Section VII - Venting
Figure 27 23 Typical Vent Installation