Install Instructions

25
Figure 12: Immersion Well Probe Insertion
11. Locate the Jacket Front Cover from Control Carton. See
also "Repair Parts" Section, "Jacket Assembly" illustration
for parts identication.
12. Align jacket front cover mounting holes with side panel
holes and secure with four #8 x ½" oval sheet metal screws
from Hardware Bag.
III. UNIT-PAK BOILER ASSEMBLY - TRIM & CONTROLS (continued)
N. FIELD ASSEMBLY OF BOILER TRIM AND
BURNERS. Refer to Section II, Paragraph F.