Install Instructions
25
Figure 12: Immersion Well Probe Insertion
11. Locate the Jacket Front Cover from Control Carton. See
also "Repair Parts" Section, "Jacket Assembly" illustration
for parts identication.
12. Align jacket front cover mounting holes with side panel
holes and secure with four #8 x ½" oval sheet metal screws
from Hardware Bag.
III. UNIT-PAK BOILER ASSEMBLY - TRIM & CONTROLS (continued)
N. FIELD ASSEMBLY OF BOILER TRIM AND
BURNERS. Refer to Section II, Paragraph F.