Instruction manual
35
e.  Not less than 3 ft (as measured to side of vent 
termination) from an inside corner of an L-shaped 
structure.
f.  Not less than 1 ft from the nearest surface of the 
terminal to a roof soft.
g.  Not directly above, or, not less than 6 ft horizontally 
from an oil tank vent or gas meter.
h.  Not less than 2 ft from nearest surface of terminal to 
an adjacent building.
B.  INSTALLATION OF THE VENT HOOD TERMINAL
1.  Inspect Direct Vent Conversion Kit Carton for damage. 
DO NOT install if any damage is evident.
2.  Direct Vent Conversion Kit Carton includes (see Figures 
20, 21 and 22):
•  Direct Vent Hood Assembly (consists of Vent Hood 
Body and Vent Hood Tee) – 1 pc
•  Backing Plate – 1 pc
•  Vacuum Relief Valve VRV-4 – 1 pc
•  Hardware  Bag  (includes  high  temperature  sealant, 
fasteners and inner pipe clamps) – 1 pc 
•  Appliance (Boiler Flue Outlet) Adapter – 1 pc
•  Appliance Clamp Halves – 2 pcs
•  Cover Sleeve Assemblies – 2 pcs
•  Cover Ring Assemblies – 2 pcs
3.  Remove vent system components from carton and set 
aside.
4.  Separate the vent hood tee from the vent hood body and 
set aside for later use. 
5.  After determining the location of the venting system 
termination, cut the square hole in the wall sized according 
to “L” dimension in Table 5, see Figure 19. 
6.  Wood or vinyl siding should be cut, so that vent hood base 
plate mounts directly on the wallboard to provide stable 
support. If siding thickness exceeds ½”, use a spacer bar 
or board behind the vent hood mounting (base) plate. See 
Figure 20.
a.  Seal the backside of the vent hood base plate around 
the outer pipe of the vent hood with a bead of high-
temperature silicone sealant (provided in Bagged 
Hardware).
b.  Mount the vent hood body from outside, through the 
wall, keeping the outer pipe centered in the hole.
c. Fasten the vent hood body to the outside wall with 
appropriate fasteners (installer provided).
d.  Seal the edges of the vent hood base plate to the wall 
with a high-temperature silicone sealant (provided in 
Bagged Hardware).
e.  While inside, position the backing plate over the 
outer pipe and fasten to inside wall with appropriate 
fasteners (installer provided).
Figure 19: Wall Cutout Dimensions
Boiler Model No.
Direct Vent Conversion 
Kit Part No.
"L" Dimension 
(Inch)
MPO-IQ147
MPO-IQ189
102130-02 8¼
MPO-IQ231 1021300-03 9¼
TABLE 5: WALL CUTOUT DIMENSIONS
Figure 20: Vent Hood Body Installation
VI. DIRECT VENTING / AIR INTAKE PIPING (continued)










