Instruction manual
4
WARNING
This boiler must be properly vented. The chimney must be inspected for any obstructions and cleaned 
prior to each heating season. A clean and unobstructed chimney ue is necessary to produce the minimum 
draft required to safely evacuate noxious fumes that could cause personal injury or loss of life. Evidence 
of loose debris and or condensate induced stains at the base of the chimney ue, connector or smokepipe 
joints may be signs of condensing ue gases. Flue gas condensate is corrosive, which requires special 
consideration and must be addressed immediately. Refer to Section V, "Venting" or Section VI "Direct 
Venting / Air Intake Piping".
This boiler needs fresh air for safe operation and must be installed so there are provisions for adequate 
combustion and ventilation air.
This boiler is supplied with controls which may cause the boiler to shut down and not re-start without 
service. If damage due to frozen pipes is a possibility, the heating system should not be left unattended in 
cold weather; or appropriate safeguards and alarms should be installed on the heating system to prevent 
damage if the boiler is inoperative.
This boiler is designed to burn No. 2 fuel oil only. Do not use gasoline, crankcase drainings, or any oil 
containing gasoline. Never burn garbage or paper in this boiler. Do not convert to any solid fuel (i.e. 
wood, coal). Do not convert to any gaseous fuel (i.e. natural gas, LP). All ammable debris, rags, paper, 
wood scraps, etc., should be kept clear of the boiler at all times. Keep the boiler area clean and free of 
re hazards.
All boilers equipped with burner swing door have a potential hazard which, if ignored, can cause severe 
property damage, personal injury or loss of life. Before opening swing door, unplug burner power cord 
from receptacle located in lower right corner of jacket front panel and turn off service switch to boiler 
to prevent accidental ring of burner outside the combustion chamber.  Be sure to tighten swing door 
fasteners completely when service is completed.
TABLE OF CONTENTS
I. Pre-Installation ........................................................................................ 8
II. Packaged Boiler Assy. - Trim & Controls ................................................. 11
III. Unit-Pak Boiler Assy. - Trim & Controls..................................................... 20
IV. Water Boiler Piping .................................................................................. 26
V. Natural Draft Venting ............................................................................... 30
VI. Direct Venting / Air Intake Piping.............................................................. 34
VII. Electrical .................................................................................................. 41
VIII. Oil Piping ................................................................................................. 45
IX. System Start-Up ...................................................................................... 47
X. Operating.................................................................................................. 52
XI. Maintenance & Service Instructions ....................................................... 57
XII. Boiler Cleaning ........................................................................................ 59
XIII. Trouble Shooting ..................................................................................... 61
XIV. Repair Parts ............................................................................................ 69
XV. Burner Specications................................................................................ 83
Appendix A - IQ Oil Control System.......................................................... 85
Appendix B - Figures................................................................................ 89
Appendix C - Tables.................................................................................. 91