User's Manual

Personnel Alert: Base Station
User Manual
Installation
a Caution
Only qualified personnel should perform
installations of the base stations. Install base
stations according to electrical codes,
regulations, and safety standards. Ensure that
correct cabling and seal fitting practices are
implemented.
The Base Station
The design of the base station has been simplified for easy
installation. The main board (Figure 11) of the base is
mounted to the inner control door, which is equipped with slip
hinges.
Main Board
Table 6. Main Board
Item Function
1
Cable connector to radio board
2
Address dip switches
3
2 or 4-wire RS-485 connectors
4
RS-485 option dip switches
5
2 or 4-wire RS-485 jumpesr
The main board is used to manually set the
address dip switches,
2-wire (half duplex) and 4-wire (full duplex) connectors,
and
wire jumpers.
Figure 5. Main Board
10