User's Manual

Personnel Alert: Base Station
User Manual
Mounting Guidelines
When mounting the base station, adhere to the following
guidelines:
To optimize the radio performance and acquire
maximum coverage, install the base station at or near
the centre of the selected coverage area.
Install the base 4-5 meters (8-10 ft.) above ground level.
Ensure that the base station is not obstructed by
surrounding objects.
Do not install the base station below 6 ft. of the above
ground level as the range of the transmitter will be
reduced.
Do not install the base station directly against a wall,
especially a metal wall. To prevent impaired radio
performance, ensure the base station is installed with a
minimum of 18 inches clearance from the wall.
If possible, install the base station in a location where
the antenna will have a clear line-of-sight with the
badges.
Install the base station as far away as possible from
other antenna systems to avoid possible radio frequency
interference (RFI).
Do not locate the base where it can be exposed to
electrical shock and/or severe mechanical shock.
Note
Atmospheric conditions may cause signal loss.
aWarning
The Personnel Alert Base Station is only
certified with the supplied 2 dBi dipole antenna.
Do not substitute this antenna with another.
12