COMPONENT UP C C R Installation Manual
Brief Introduction of BWE Company Catalog 1. About US............................................1 2. UPC Certification................................2 3. Dual Function Shower System..............4 (English Version) 4. Warranty............................................17 5. Clean and Maintain Product.................
IAPMO RESEARCH AND TESTING, INC. IAPMO RESEARCH AND TESTING, INC. COMPONENT CERTIFICATE OF LISTING 500 East Philadelphia Street, Ontario, California 91761-2816-USA909-472-4100909-472-4244 wwwiapmort org UP C C COMPONENT UP C C R CERTIFICATE OF LISTING IAPMO Research and Testing Inc. is a product certification body which tests and inspects samples taken from the supplier's stock or from the market or a combination of both to verify compliance to the requirements of applicable codes and standards.
1. Before you start, prepare the wall for installation Essential accessories list (The depth shown here is for reference only;please determine actual depth according to thickness of bathroom tiles.) OR 1 2 3 (Concrete wall) (Wood wall) A:Wall Mounted lnstallation B:Ceiling Mounted lnstallation 4 5 6 2.2inch 7 8 10 9 Design water pipe slot 11 13 12 14 2.2inch Recommend using copper drop ear pipe elbow(1/2-14 NPT) This product does not include this part Design water pipe slot 2.
Determine the position of the valve A:Wall Mounted lnstallation Recommend using copper drop ear pipe elbow(1/2-14 NPT) This product does notinclude this part B:Ceiling Mounted lnstallation X X X X 2.
2.Wipe off any dirt and/or impurities from the insides of all pipes and fittings (The depth shown here is for reference only; please determine actual depth according to thickness of bathroom tiles.) A:Wall Mounted lnstallation 2.2inch Recommend using copper drop ear pipeelbow(1/2-14 NPT) This product does notinclude this part Wrap enough teflon tape B:Ceiling Mounted lnstallation 20 20 2.
3. Check for leakage and/or blockage on both hot and cold water supplies. 4. Tiles (If the tiles are too thick, there will not be enough space to install plate 8 knob 9 and handle 10 ) (Shower valve must be connected to both hot AND cold water pipes. As a safety feature, the valve will only work if both pipes are connected properly.
5. Install S hower bracket B:Ceiling Mounted lnstallation 4 18 4 A:Wall Mounted lnstallation 18 Cut away the part of the embedded box sticking out so that it is level with the wall.
7. Install Shower Arm and Rain Shower Head 6.
7B. Install Ceiling Shower Arm and Rain Shower Head Customer Name 1X 1 1X 1X 2B 3 Longer thread for ceiling mount 3 Retailer/Assembly Fitter Purchase Date Warranty Duration 5 years as of purchase date 1. If the above contents are not complete, the warranty will be considered void, please confirm the above contents when you purchase 2. The complimentary repairs are limited to instances mentioned on the warranty card only. 3.
Clean and maintain product How to clean shower head nozzles 1. Just rub the nozzles with your finger or a toothbrush to loosen any deposits, and then run hot water for a few minutes 2.Put the showerhead into a pot .Consider using a smaller container that just about fits the showerhead; this way, you will use less vinegar. You can also use a small bucket or plastic bin. Fill the pot with enough white vinegar to cover the showerhead.