Instructions / Assembly

Adjustable Wrench Allen key
Philips Screwdriver
INSTALLATION MANUAL Tools You will need
Wall Mounted Bathtub Faucet Installation
Teflon Tape
4.Turn the water on for 1 minute to flush
any debris. Apply Teflon tape (H) to the
threaded tail pipe and install the shower
hose (I) into the outlet on the wall,Then
connect the top shower (P) to the spout.
5.Apply Teflon tape (H) to the threaded
end,the fix the cover plate (J) onto the wall
supply holder (K) and screw the wall
supply holder (K) into the hand shower
outlet.
6.Add rubber washers (L) at both ends of
the shower hose (M).Connect shower
hose (M) to the wall supply holder (K) and
hand shower (N).Then, place the hand
shower (N) to the wall supply holder (K).
Before the Installation
1.Check the package and confirm all parts are included. If any part is missing or damaged, please contact
us.
2.Do not disassemble the main body,as it has been installed & commissioned correctly & precisely before
leaving the factory.
3.Shut off the main water supply prior to beginning installation.
4.Do flush the water supply lines to remove any dirt and debris before installation (IMPORTANT) .
5.Make sure to connect the hot/cold inlet pipe correctly.If standing in front,connect hot water pipe to the left
and cold water pipe to the right.
6.After the installation,check for leaks and make sure every joint is safely sealed.
Cleaning and Maintenance
1.Rinse with clean water and dry with a soft cloth.
2.Do not use any detergent,acid,polisher,abrasives,or harsh cleaners.
3.Do not use cloth with a coarse surface.
H
P
K
M
L
N
I
J
K
H
3.Remove the protective cover when the finished
wall is completed and install the escutcheon (B) to
the valve (A) and press it against the finished
wall.Then, install the handle (C) and diverter knob
(D),tighten set screws (E) with Allen key (F),and
put on the indication buttons (G).
A
D
C
B
E
F
G
hot water inlet
cold water inlet
outlet 1
outlet 2
outlet 3
2(1).According to the site condition and the
installation size requirement to set up the pipe
line.(2).Connect the plastic box to the pipe,put
the plastic box on the hole,then adjusted the
levels(the bubble on the middle of the
leveller).(3).Make the positioning holes.
1.Acoording to the site condition and the
installation size requirement and to make a
hole,the hold size is 180mm(length)*130mm
(width)*65-75mm(deep).

Summary of content (1 pages)