User's Manual

NÜO Go! Manual
Installation
15
NÜO DC Go! 8
2.3. NÜO DC GO!8 ASSEMBLY
Step 1: Drill holes for 6 mm studs using the
IV_HZH[LTWSH[L[VTHYR[OLPYWVZP[PVU
Assemble the equipment using a Philips
screwdriver (bolts and studs supplied with
the equipment).
Step 3: Connect the equipment as instruc-
ted in “Step 6. Diagrams”"
6. Diagrams".
Finally, place the cover on the equipment.
Step 2 (optional): Install the batteries
and connect them to the equipment in
[OLVYKLYZWLJPÄLK
Step 4: Equipment installed in the wall.
270
270
Ø6
The equipment must be disconnected from the main power supply (230V) before ins-
WDOODWLRQ7KHEDWWHULHVZLOOQRWZRUNXQWLOWKHGRRUVKDYHEHHQFRQÀJXUHGLQWKH1h2
Go! web app.
Dimensiones en mm.
Put the battery retainers to prevent
them from moving