SmartSwitch 9000 9C500 Plus Power Box Installation Guide 9031344-02
Notice Notice Cabletron Systems reserves the right to make changes in specifications and other information contained in this document without prior notice. The reader should in all cases consult Cabletron Systems to determine whether any such changes have been made. The hardware, firmware, or software described in this manual is subject to change without notice.
Notice FCC Notice This device complies with Part 15 of the FCC rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. NOTE: This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to Part 15 of the FCC rules.
Notice Declaration of Conformity Addendum Application of Council Directive(s): 89/336/EEC 73/23/EEC Manufacturer’s Name: Cabletron Systems, Inc. Manufacturer’s Address: 35 Industrial Way European Representative Name: European Representative Address: Conformance to Directive(s)/Product Standards: Equipment Type/Environment: PO Box 5005 Rochester, NH 03867 Mr. J.
Notice iv
Contents Chapter 1 Installing the 9C500 Plus Power Box Getting Help .................................................................................................................. 1-2 Installation...................................................................................................................... 1-2 Installing the Power Box ....................................................................................... 1-3 Connecting Auxiliary Power Cord........................................
Contents vi
Chapter 1 Installing the 9C500 Plus Power Box The 9C500 Plus Power Box (power box) is installed in a standard 19 inch equipment rack near the SmartSwitch 9000 9C114 Chassis (chassis) only after two power supplies (9C214-1 AC or 9C214-2 DC) have been attached directly to the chassis. Power supplies are added to ensure adequate power for the modules installed, or to achieve power redundancy. Two power supplies can be added per power box, and two power boxes can be installed per chassis.
Installing the 9C500 Plus Power Box Getting Help For additional support related to this device or document, contact Cabletron Systems using one of the following methods: World Wide Web http://www.cabletron.com/ Phone (603) 332-9400 Internet mail support@cabletron.com FTP ftp://ftp.cabletron.
Installing the 9C500 Plus Power Box 5. Ensure the power supply wiring is routed away from sharp edges. 6. Power up the power supplies. Installing the Power Box NOTE If you are installing more than one power box in an equipment rack, to prevent tipping, the SmartSwitch 9000 Chassis should be moved to the bottom of the rack before installing the power boxes; or the rack should be secured to the floor. Complete the installation of the first power box by following the steps below: 1.
Installing the 9C500 Plus Power Box 1. Loosen and remove the two screws from the right auxiliary power source connector cover (looking from the back of the equipment rack to the front) on the rear of the chassis. 2. Remove the connector cover. (Keep the cover in the event you need to remove the power box connection. The cover must be replaced to protect the connector.) 3. Plug one end of the auxiliary power cord into the connection on the power box and secure the connection by tightening the thumb screws.
Installing the 9C500 Plus Power Box No. 1 Righthand Connector Sequence 1,2,3,4 3 4 No. 2 Lefthand Connector Sequence 1,2,5,6 5 6 Securing Screw Connector 1 2 1 2 100-125v-12A 100-125v-12A 100-125v-12A 100-125v-12A 200-250v-6A 200-250v-6A 200-250v-6A 200-250v-6A 50-60 Hz 50-60 Hz 50-60 Hz 50-60 Hz Auxiliary Power Source Connectors Figure 1-1.
Installing the 9C500 Plus Power Box Installing Power Supplies Two power supplies (either two 9C214-1 AC, or two 9C214-2 DC; but not one of each) can be installed in a power box. The power supplies installed in the power box must be identical to those attached to the back of the SmartSwitch 9000 Chassis. For example, if two 9C214-1 AC Power Supplies are attached to the SmartSwitch 9000 Chassis, only 9C214-1 AC Power Supplies can be installed in a power box.
Installing the 9C500 Plus Power Box Slide this end in toward front of chassis 100-125v-12A 200-250v-6A 50-60 Hz 1 2 100-125v-12A 100-125v-12A 200-250v-6A 200-250v-6A 50-60 Hz 50-60 Hz Figure 1-2.
Installing the 9C500 Plus Power Box 2. Check that the LEDs for SMB (system management bus) and PWR (power) are green. If the LEDs are any color other than green, refer to the SmartSwitch 9000 9C214-1 AC Power Supply Installation Guide or the SmartSwitch 9000 9C214-2 DC Power Supply Installation Guide. Replacing Power Supplies If it becomes necessary to replace a power supply that has been installed in a power box, power (AC or DC) to the power supply must be interrupted before it is removed.
Installing the 9C500 Plus Power Box Operating Specifications Safety Specifications ! It is the responsibility of the person who sells the system to ensure that the total system meets allowed limits of conducted and radiated emissions. CAUTION This equipment meets: The safety requirements of: • UL 1950 • CSA C22.2 No.
Installing the 9C500 Plus Power Box Plus Power Box Dimensions 22.22 H x 48.3 W x 56.52 D centimeters (8.75 H x 19.0 W x 25.25 D inches) Weight Unit: Shipping: 1-10 5.40 kilograms (12 pounds) 6.