User`s guide

Table Of Contents
USING LANVIEW
SEHI USER’S GUIDE 5-3
Note: Flashing indicates an irregular LED pulse.
Blinking indicates a steady LED pulse.
Figure 5-1. LANVIEW LEDs
PWR
When this green LED is on, it indicates that the SEHI is receiving power.
If this LED is off, it indicates a loss of input power. Check the input
power source (circuit breaker, fuse, etc.). If the proper source power is
present, the problem could be with the SEHI.
CPU
This LED alternates from red to green during power up. After the boot is
complete, the LED blinks green. A blinking green LED indicates normal
operation. A red LED indicates a faulty processor.
LED Name
PWR
(Power)
CPU
(Central Processing Unit)
CLN
(Collision)
RCV
(Receive)
LNK
(Link)
LED Color
Off
Green (Solid)
Off
Green (Flashing)
Green (Blinking)
Red (Solid)
Red
Yellow (Flashing)
Off
Green
Off
Definition
No power
Power
CPU in BOOT process
CPU initializing
CPU functioning
CPU not functioning
Collision
SEHI is receiving data
No activity
Link established
No link
PWR
CPU
CLN
E1
HubSTACK 10BASE-T HUB WITH LANVIEW®
SEHI-24
COM
RESET
24X
23X
E2
24 22 20 18 16 14 12 10 8 6 4 2
RCV
LNK
RCV
LNK
23 21 19 17 15 11 9 7 5 3 113
1490_19