Operating instructions

32
7.1 General
Use piping materials and joining methods acceptable
to authority having jurisdiction. In absence of such
requirements:
USA - National Fuel Gas Code, ANSI Z223.1/NFPA
54
Canada - Natural Gas and Propane Installation Code,
CAN/CSA B149.1
Size and install gas piping system to provide sufcient
gas supply to meet maximum input at not less than
minimum supply pressure. See Table 10.
Support piping with hooks straps, bands, brackets,
hangers, or building structure components to prevent or
dampen excessive vibrations and prevent strain on gas
connection. Boiler will not support piping weight.
Use thread (joint) compound (pipe dope) suitable for
liqueed petroleum gas.
Provide sediment trap up stream of gas valve.
Install manual main shutoff valve outside of jacket. See
gure 7-2.
7.2 Conversion Kit Instructions
See Gas Conversion Kit Instructions included with Boiler.
Table 10 - Gas Supply Pressure
CAUTION
WHAT TO DO IF YOU SMELL GAS
Do not try to light any appliance.
Do not touch any electrical switch; do not use
any phone in your building.
Immediately call your gas supplier from a
neighbor’s phone. Follow gas supplier’s
instructions.
• If you cannot reach your gas supplier, call the re
department.
!
Gas Supply Pressure
MODEL
Natural Gas Propane
Min. Max. Min. Max.
050
3.0" w.c. (0.7
kPa)
13.5" w.c.
(3.3 kPa)
5.0" w.c. (1.2
kPa)
13.5" w.c. (3.4
kPa)
075
100
150
200
299
FIGURE 7-1 Gas Connection
Note: See Glossary - Piping Table 16
NOTICE
Use two (2) wrenches when tightening and tting
to pipe boiler's threaded ttings. Boiler's internal
piping can be damaged if subjected to excessive
torque.
Gas Connection
7 - GAS SUPPLY PIPING