Spec Sheet

Ca
25.1 Cu. Ft. Built-in
Side-by-Side Refrigerator
CSB42WP 2NS1
ADDITIONAL SPECIFICATIONS
A 120 volt, 60Hz, 15 or 20 amp power supply is required. An individual
properly grounded branch circuit or circuit breaker is recommended.
Install a properly grounded 3-prong electrical receptacle recessed
into the back wall. Electrical must be located on rear wall as shown.
ADDITIONAL ACCESSORIES
© 2019 GE Appliances PC92627 5/19
For answers to your Café™ product questions, visit our website at cafeappliances.com.
CXSS2H2PMBZ
Brushed Bronze
2 handles
CXSS2H2PMBT
Brushed Black
2 handles
CXSS2H2PMCU
Brushed Copper
2 handles
DIMENSIONS AND INSTALLATION
SIDE PANELS
Side panels (not supplied) must be used whenever the sides of the
refrigerator will be exposed. The 1/4" side panels will slip into the side
case trim. Order side panels from your cabinet manufacturer.
* Depending on installation height.
FLOORING
For proper installation, this refrigerator must be placed on a level
surface of hard material that is at the same height as the rest of the
flooring. This surface should be strong enough to support a fully loaded
refrigerator, or approximately 1500 lbs.
NOTE: Protect the finish of the flooring. Cut a large section of the cardboard
carton and place under the refrigerator where you are working.
WATER AND ELECTRICAL LOCATIONS
The opening must be prepared with the electrical and water supply
located as shown.
THE CUTOUT DEPTH MUST BE 24"
The refrigerator will project forward, slightly beyond adjacent
cabinets, depending on your installation.
24"
*84
"
*3" to 4"
1-1/2"
FRONT VIEW
E
WATER
*83-1/2" MIN
*84-1/2" MAX
*Trim will overlap
additional 7/16"
75"
From floor
to bottom
of electrical
area
41-1/2" for 42" width models
47-1/2" for 48" width models
18" for 42"
width models
20" for 48"
width models
6"
5"
A
B
5" 5" 3-1/2"
AMounting the junction
in this location will
also allow for front
accessibility through
access panel.
B – Water supply area.
SIDE PANEL
FRONT VIEW
NOTE: GFI (ground fault interrupter) is not recommended. Water line can enter
the opening through the floor or rear wall. The water line installed should be
1/4" O.D. copper tubing or GE SmartConnect™ tubing between the cold water
line and water connection location. The line should be long enough to extend
to the front of the refrigerator. Installation of an easily accessible shuto valve
in the water line is required.