Installation Instructions

PREPARE THE OPENING
The Advantium/Convection 120 can be installed beside
another Advantium/Convection 120 in a side-by-side
combination.
Double Advantium/Convection 120
Installation:
Cut the opening in a cabinet to the dimensions shown.
Center divider acts as cleat for side of each respective
unit. Only one additional side cleat needed per oven
cutout.
The support must be level and rigidly mounted, flush
with the bottom edge of the cutout.
19-1/4”
Construct solid bottom - Min. 3/8”
plywood supported on all four
sides. Must be able to support
weight of oven and contents.
36-3/4”
Min.
I*
23-1/2” min.
I*
H*
G*
1-3/8”
*See table for desired reveals on sides and
between unit.
10
Flush Mount Installation Preparation (Monogram Only)
IMPORTANT: Always maintain 36-3/4” minimum height from the floor to the cutout in any single or
combined installation unless plastic trim is installed.
Cooktop
Cooktop
25Ǝ
1-1/2Ǝ Min.
4Ǝ High
Toekick
23-1/2
Ǝ
J*
19-1/4”
36
Ǝ
Countertop
Height
NOTE: The oven is only approved to be
installed under the specific models as
labeled on the unit.
Installation under a GE Appliances/Monogram 30Ǝ or 36Ǝ Cooktop or Countertop:
Gas or electric cooktops may be installed over this oven. See cooktop installation instructions for the cutout size.
See the label on top of the oven for approved cooktop models. This oven requires a separate from the cooktop,
properly grounded 15-Amp, 120-Volt, 60Hz power supply. Use a 36Ǝ or wider base cabinet.
Cooktop height including depth of electrical box on some
models. Refer to cooktop installation instructions.
No minimum clearance required between cooktop and
oven.
Dimension 1/8” Reveal 1/4” Reveal
G 59-7/8” 60-1/4”
H 5-1/8” 5-1/4”
I 27-3/8” 27-1/2”
Dimension 1/8”
Reveal
1/4”
Reveal
J 30” 30-1/4”
*See table for desired reveals on sides.