Product Specifications
Built-In Microwave/Convection Oven
CWB713P2NS1
© 2019 GE Appliances PC 91680 01/19
DIMENSIONS AND INSTALLATION INFORMATION
(IN INCHES)
For answers to your Café™ product questions, visit our website at cafeappliances.com.
Note: Cabinets installed adjacent to wall ovens must have
an adhesion spec of at least a 194°F temperature rating.
INSTALLATION INFORMATION: Before installing, consult
installation instructions packed with product for current
dimensional data.
29-3/4"
C
L
4-3/16"
25-1/8"
Cutout width
Junction
box location
24-3/4"
depth incl.
handle
24-3/4"
depth incl.
handle
Construct Solid
Bottom MIN.
3/8" Plywood
Supported by
2 x 4 or 1 x 2
Runners, all
Four Sides.
(Must Support
150 lbs.)
23-1/2"
Cutout depth
(Must support 130 lbs.)
2x4’s or
equivalent
solid floor
21-5/8"
over centerline
of cabinet
Suitable
bracing
to support
runners
A= Allow 1" overlap of oven over bottom edge of cutout, and allow
1-1/4" overlap at top edge of cutout.
B= Allow 11/16"- 3/4" for overlap of oven over side edges of cutout.
5" MIN. from
floor 1" MIN.
above toekick
Built-in Microwave Oven Dimensions (in inches) and
Cabinet Installation (in inches)
Note: Cabinets installed adjacent
to wall ovens must have an adhesion
spec of at least 194° F temperature rating.
17-1/2"
Cutout height
29-7/8"
19-1/8"
Conduit
(48-1/2"
long)
30"
B
A
29-7/8"
21-1/2"
Back
of Control
19-1/8"
Conduit
(46" long)
4-3/16"
2" MIN. between cutouts
2-1/2" MIN. between cutouts
recommended—2" MIN. required
9-1/4" cutout height
28-1/2" cutout width
Junction box location
Construct Solid Bottom
MIN. 3/8" Plywood Supported by
2 x 4 or 1 x 2 Runners, all Four Sides.
(Must Support 150 lbs. for Advantium)
(Must Support 200 lbs. for Wall Oven)
1" MIN. above toekick or adjust
to oven installation height
A
B
Cabinet width
A
B
21-1/2"
Back of Control
CWB713P2NSS
29-3/4"
C
L
4-3/16"
25-1/8"
Cutout width
Junction
box location
24-3/4"
depth incl.
handle
24-3/4"
depth incl.
handle
Construct Solid
Bottom MIN.
3/8" Plywood
Supported by
2 x 4 or 1 x 2
Runners, all
Four Sides.
(Must Support
150 lbs.)
23-1/2"
Cutout depth
(Must support 130 lbs.)
2x4’s or
equivalent
solid floor
21-5/8"
over centerline
of cabinet
Suitable
bracing
to support
runners
A= Allow 1" overlap of oven over bottom edge of cutout, and allow
1-1/4" overlap at top edge of cutout.
B= Allow 11/16"- 3/4" for overlap of oven over side edges of cutout.
5" MIN. from
floor 1" MIN.
above toekick
Built-in Microwave Oven Dimensions (in inches) and
Cabinet Installation (in inches)
Note: Cabinets installed adjacent
to wall ovens must have an adhesion
spec of at least 194° F temperature rating.
17-1/2"
Cutout height
29-7/8"
19-1/8"
Conduit
(48-1/2"
long)
30"
B
A
29-7/8"
21-1/2"
Back
of Control
19-1/8"
Conduit
(46" long)
4-3/16"
2" MIN. between cutouts
2-1/2" MIN. between cutouts
recommended—2" MIN. required
9-1/4" cutout height
28-1/2" cutout width
Junction box location
Construct Solid Bottom
MIN. 3/8" Plywood Supported by
2 x 4 or 1 x 2 Runners, all Four Sides.
(Must Support 150 lbs. for Advantium)
(Must Support 200 lbs. for Wall Oven)
1" MIN. above toekick or adjust
to oven installation height
A
B
Cabinet width
A
B
21-1/2"
Back of Control
CWB713P2NSS
29-3/4"
C
L
4-3/16"
25-1/8"
Cutout width
Junction
box location
24-3/4"
depth incl.
handle
24-3/4"
depth incl.
handle
Construct Solid
Bottom MIN.
3/8" Plywood
Supported by
2 x 4 or 1 x 2
Runners, all
Four Sides.
(Must Support
150 lbs.)
23-1/2"
Cutout depth
(Must support 130 lbs.)
2x4’s or
equivalent
solid floor
21-5/8"
over centerline
of cabinet
Suitable
bracing
to support
runners
A= Allow 1" overlap of oven over bottom edge of cutout, and allow
1-1/4" overlap at top edge of cutout.
B= Allow 11/16"- 3/4" for overlap of oven over side edges of cutout.
5" MIN. from
floor 1" MIN.
above toekick
Built-in Microwave Oven Dimensions (in inches) and
Cabinet Installation (in inches)
Note: Cabinets installed adjacent
to wall ovens must have an adhesion
spec of at least 194° F temperature rating.
17-1/2"
Cutout height
29-7/8"
19-1/8"
Conduit
(48-1/2"
long)
30"
B
A
29-7/8"
21-1/2"
Back
of Control
19-1/8"
Conduit
(46" long)
4-3/16"
2" MIN. between cutouts
2-1/2" MIN. between cutouts
recommended—2" MIN. required
9-1/4" cutout height
28-1/2" cutout width
Junction box location
Construct Solid Bottom
MIN. 3/8" Plywood Supported by
2 x 4 or 1 x 2 Runners, all Four Sides.
(Must Support 150 lbs. for Advantium)
(Must Support 200 lbs. for Wall Oven)
1" MIN. above toekick or adjust
to oven installation height
A
B
Cabinet width
A
B
21-1/2"
Back of Control
CWB713P2NSS
ADDITIONAL ACCESSORIES
CXB30HKPNBZ
Brushed Bronze
1 handle; 1 knob
CXB30HKPNSS
Brushed Stainless
1 handle; 1 knob
CXB30HKPNBT
Brushed Black
1 handle; 1 knob
CXB30HKPNCU
Brushed Copper
1 handle; 1 knob