Specification Sheet
Built-In Microwave/Convection Oven
CWB713P2NS1
DIMENSIONS AND INSTALLATION INFORMATION
(IN INCHES)
For answers to your Café™ product questions, visit our website at cafeappliances.com.
Note: Cabinets installed adjacent to wall ovens must have
an adhesion spec of at least a 194°F temperature rating.
INSTALLATION INFORMATION: Before installing, consult
installation instructions packed with product for current
dimensional data.
29-3/4"
C
L
C
(Platform must be able to support
cabinet load, weight of oven, and
additional oven loads)
4-3/16"
25-1/4"
Cutout width
Junction
box location
24-3/4"
depth incl.
handle
24-3/4"
depth incl.
handle
23-1/2"
Cutout depth
2x4’s or
equivalent
solid floor
21-5/8"
over centerline
of cabinet
Suitable
bracing
to support
runners
5" MIN. from
floor 1" MIN.
above toekick
Built-in Microwave Oven Dimensions (in inches) and
Cabinet Installation (in inches)
Note: Cabinets installed adjacent
to wall ovens must have an adhesion
spec of at least 194° F temperature rating.
17-1/2"
Cutout height
29-3/4"
19"
Conduit
(48-1/2"
long)
30"
B
A
29-3/4"
21-1/2"
Back
of Control
19"
Conduit
(46" long)
4-3/16"
2" MIN. between cutouts
3" MIN. between cutouts
recommended—2" MIN. required
Cutout height and width
per drawer requirements
Junction box location
Construct Solid Bottom
MIN. 3/8" Plywood Supported by
2 x 4 or 1 x 2 Runners, all Four Sides.
(Each platform must be able to support
cabinet load, weight of oven, and
additional oven loads)
1" MIN. above toekick or adjust
to oven installation height
A
B
Cabinet width
21-1/2"
Back of Control
CWB713P2NSS
C
Construct Solid Bottom
MIN. 3/8" Plywood
Supported by 2 x 4
or 1 x 2 Runners,
all Four Sides.
(Platform must be
able to support cabinet
load, weight of oven,
and additional
oven loads)
A = The unit overlap is 1/2" but allow 5/8" clearance from top edge of cutout
B = The unit overlap is 2-1/4" but allow 2-3/8" clearance from side edges of cutout
C = The unit overlap is 1" but allow 1-1/8" clearance from bottom edge of cutout
29-3/4"
C
L
C
(Platform must be able to support
cabinet load, weight of oven, and
additional oven loads)
4-3/16"
25-1/4"
Cutout width
Junction
box location
24-3/4"
depth incl.
handle
24-3/4"
depth incl.
handle
23-1/2"
Cutout depth
2x4’s or
equivalent
solid floor
21-5/8"
over centerline
of cabinet
Suitable
bracing
to support
runners
5" MIN. from
floor 1" MIN.
above toekick
Built-in Microwave Oven Dimensions (in inches) and
Cabinet Installation (in inches)
Note: Cabinets installed adjacent
to wall ovens must have an adhesion
spec of at least 194° F temperature rating.
17-1/2"
Cutout height
29-3/4"
19"
Conduit
(48-1/2"
long)
30"
B
A
29-3/4"
21-1/2"
Back
of Control
19"
Conduit
(46" long)
4-3/16"
2" MIN. between cutouts
3" MIN. between cutouts
recommended—2" MIN. required
Cutout height and width
per drawer requirements
Junction box location
Construct Solid Bottom
MIN. 3/8" Plywood Supported by
2 x 4 or 1 x 2 Runners, all Four Sides.
(Each platform must be able to support
cabinet load, weight of oven, and
additional oven loads)
1" MIN. above toekick or adjust
to oven installation height
A
B
Cabinet width
21-1/2"
Back of Control
CWB713P2NSS
C
Construct Solid Bottom
MIN. 3/8" Plywood
Supported by 2 x 4
or 1 x 2 Runners,
all Four Sides.
(Platform must be
able to support cabinet
load, weight of oven,
and additional
oven loads)
A = The unit overlap is 1/2" but allow 5/8" clearance from top edge of cutout
B = The unit overlap is 2-1/4" but allow 2-3/8" clearance from side edges of cutout
C = The unit overlap is 1" but allow 1-1/8" clearance from bottom edge of cutout
29-3/4"
C
L
C
(Platform must be able to support
cabinet load, weight of oven, and
additional oven loads)
4-3/16"
25-1/4"
Cutout width
Junction
box location
24-3/4"
depth incl.
handle
24-3/4"
depth incl.
handle
23-1/2"
Cutout depth
2x4’s or
equivalent
solid floor
21-5/8"
over centerline
of cabinet
Suitable
bracing
to support
runners
5" MIN. from
floor 1" MIN.
above toekick
Built-in Microwave Oven Dimensions (in inches) and
Cabinet Installation (in inches)
Note: Cabinets installed adjacent
to wall ovens must have an adhesion
spec of at least 194° F temperature rating.
17-1/2"
Cutout height
29-3/4"
19"
Conduit
(48-1/2"
long)
30"
B
A
29-3/4"
21-1/2"
Back
of Control
19"
Conduit
(46" long)
4-3/16"
2" MIN. between cutouts
3" MIN. between cutouts
recommended—2" MIN. required
Cutout height and width
per drawer requirements
Junction box location
Construct Solid Bottom
MIN. 3/8" Plywood Supported by
2 x 4 or 1 x 2 Runners, all Four Sides.
(Each platform must be able to support
cabinet load, weight of oven, and
additional oven loads)
1" MIN. above toekick or adjust
to oven installation height
A
B
Cabinet width
21-1/2"
Back of Control
CWB713P2NSS
C
Construct Solid Bottom
MIN. 3/8" Plywood
Supported by 2 x 4
or 1 x 2 Runners,
all Four Sides.
(Platform must be
able to support cabinet
load, weight of oven,
and additional
oven loads)
A = The unit overlap is 1/2" but allow 5/8" clearance from top edge of cutout
B = The unit overlap is 2-1/4" but allow 2-3/8" clearance from side edges of cutout
C = The unit overlap is 1" but allow 1-1/8" clearance from bottom edge of cutout
ADDITIONAL ACCESSORIES
CXB30HKPNBZ
Brushed Bronze
1 handle and 1 knob
CXB30HKPNSS
Brushed Stainless
1 handle and 1 knob
CXB30HKPNBT
Brushed Black
1 handle and 1 knob
CXB30HKPNCU
Brushed Copper
1 handle and 1 knob
© 2020 GE Appliances PC95218 10/20