LTR50001041, Rev.
Table of Contents Planning the Best Location . . . . . . . . . . 3 Preparing a Good Foundation . . . . . . . . 4 Electrical Requirements . . . . . . . . . . . . . 5 Natural Gas Installation . . . . . . . . . . . . . 6 Water and Drainage Installation . . . . . . 6 Getting Barbecue Island Into Yard . . . . 7 Installation After Delivery . . . . . . . . . . . 8 Barbecue Island Footprints . . . . . . . . . .
Planning the Best Location Here are some of the things that you will need to consider when determining where to place your new barbecue island. Safety First Do not place your barbecue island near trees and shrubs. Be certain that your installation will meet all city and local safety codes and requirements. You can install an awning over your barbecue island, provided you make sure it is high enough to prevent damage or fire.
Preparing a Good Foundation Your barbecue island needs a solid and level foundation. Damage caused by inadequate or improper foundation support is not covered by the warranty. It is the responsibility of the owner to provide a proper foundation for the barbecue island. If you do not already have a location for your barbecue island, we recommend you have a concrete slab prepared to accommodate it.
Electrical Requirements You do not need to hire a contractor to install your electrical service, but you must ensure you have all required permits and the installation complies with State and local code. We recommend you hire a certified contractor if you do not wish to do the installation yourself. refer to the following: If your dealer is not a certified contractor, you will need to hire a contractor for installation of your electrical service.
Natural Gas Installation You do not need to hire a contractor to install your natural gas service, but you need to make sure you have all required permits and ensure the installation complies with State and local code. We recommend you hire a certified contractor if you do not wish to do the installation yourself. If your dealer is not a certified contractor, you will need to hire a contractor for installation of your gas service.
Getting Barbecue Island Into Yard Check the Dimensions of the Barbecue Island • Barbecue islands need at least the width of the island plus 12”. Your dealer can provide you with the dimensions of your barbecue island, or you can find them at www. calflamebbq.com. • If the delivery route will require a 90º turn, check the measurements at the turn to ensure the barbecue island will fit. During delivery, the barbecue island must remain on the delivery cart at all times.
Installation After Delivery For more information on installing your grill and accessories, see the grill and carts owner’s manual. If your barbecue island has two or more pieces, you or your contractor will mate pieces and bolt them together. When sections are aligned and in place, apply grout and do whatever else is necessary cosmetically to ensure the barbecue island is attractive and presentable.
Barbecue Island Footprints 57" 4" Gas and Gas and electrical electrical services services 60" 57" 57" 4" 6" 28" 28" 28" 51" 51" 51" Represent Represents so 60" 51" Represent Represents op 6" 6" Gas and Gas and electrical electrical services services 25" 25" 22" 73¾" 73¾" 4" 4" 3" 3" 6" 22" 6" 3" 6" 36" Front Front 25" 36" 25" LBK701 LBK710 LBK701 LBK710 75.5" 75.
60" 60" 10 51" 51" 51" 6" LBK401RLBK401R 6" 6" 73¾" 4" nd ical ces Gas and electrical services 48.75"25" 48.75" 4" 4" 36" Gas and electrical services Front 6" 3" Gas and electrical6" services 6" 25" 22" 22" 10 6" 85.
LBK830L Front 8½" LBK801 LBK810 LBK820 3" 3" Gas service 6" 29" 37" LBK830L 38" 6" 25½" Gas and 6" Gas service 38" electrical services 37" 67½" Water service (line and drain) 33" 4" 4" 67½" LBK830R 8½" LBK870L 25" 3" 3" 3" 3" 93" 25½" 25½" Gas service 6" Gas service 6" 25½" 38" 38" 67½" Electrical service 67½" 67½" 67½" LBK870L 93" Water service (line and drain) 4" 4" LBK870R 25" 6" 5" 3" 25½" " 57" 57" 4" Gas and electrical services 60" Water service (li
PV6016 with PV6004 and PV6016 without optional solid foot rest 8" 73.75" 4" 3" 6" Gas and electrical services Gas and electrical services 3" 33.75" Front 36" PV6016 with optional solid foot rest 6 without est Note: Drawing are approxim PV70 Optional solid foot rest 8" 73.75"optional solid foot rest PV7000 without 4" 3" 3" 33.75" Gas and electrical services 8" 113" 4" Gas and 6" electrical services Front 7" 36" Repres 38.75" 6" Repres 3" 50" Front 51.
PV7000 with PV6016 with optional solid foot rest PV7000 without optional solid foot rest Note: Drawings are not to scale are approximate and may vary 8" Optional solid foot rest 8" 3" " Gas and electrical services Gas and electrical services 3" 113" 4" 73.75" 4" Represents solid barbecu 6" 6" Represents open space w 38.75" 50" 36" Front 51.
7" 7" Front 14 PV7000 with optional solid foot rest Optional solid foot rest nal solid foot rest 8" 113" 4" " GPV3032 with GPV3032 without optional solid foot rest 6" Gas and 50" 11" 95.75" electrical 3" 8" services 56.75" 50" 4" 51.75" 3" Gas and electrical services 46" 7" ont Gas and electrical services 6" 3" 33.75" Front GPV3032 with optional solid foot rest onal solid foot rest 95.
7" Front GPV3100 without optional solid foot rest 79" 2 with optional solid foot rest Optional solid foot rest 4" 65" Gas and electrical services 4" 6" 73" 11" 38.75" ° 46" 45 Gas and electrical services 95.
LMS Customer Service Department 1462 East Ninth Street Pomona, CA 91766 Toll Free: 1-800-225-7727 Fax: 1-909-629-3890 www.calflamebbq.com WARNING! Proposition 65 Warning: Handling the brass material on this product exposes you to lead, a chemical known to the State of California to cause cancer, birth defects or other reproductive harm. (Wash hands after handling this product.