Operating instructions

48GS, 48GX
Single Packaged Gas Heating/
Electric Cooling Units
Installation, Start-Up, and Operating Instructions
48GS Sizes 018-060, 48GX Sizes 024-060
NOTE: Read the entire instruction manual before starting the
installation.
TABLE OF CONTENTS
SAFETY CONSIDERATIONS.....................................................1
INTRODUCTION..........................................................................2
RECEIVING AND INSTALLATION ..........................................2
CHECK EQUIPMENT.............................................................2
IDENTIFY UNIT ................................................................2
INSPECT SHIPMENT........................................................2
INSTALLATION ................................................................2
PROVIDE UNIT SUPPORT....................................................2
ROOF CURB.......................................................................2
SLAB MOUNT ...................................................................2
GROUND MOUNT ............................................................5
FIELD FABRICATE DUCTWORK........................................5
PROVIDE CLEARANCES......................................................6
RIG AND PLACE UNIT.........................................................7
CONNECT CONDENSATE DRAIN......................................7
INSTALL FLUE HOOD..........................................................8
INSTALL GAS PIPING...........................................................8
INSTALL DUCT CONNECTIONS ......................................10
CONFIGURING UNITS FOR DOWNFLOW (VERTI-
CAL) DISCHARGE..........................................................10
INSTALL ELECTRICAL CONNECTIONS.........................12
HIGH-VOLTAGE CONNECTIONS................................12
SPECIAL PROCEDURES FOR 208-V OPERATION ...13
CONTROL VOLTAGE CONNECTIONS.......................13
HEAT ANTICIPATOR SETTING...................................13
TRANSFORMER PROTECTION....................................13
PRE-START-UP ..........................................................................15
START-UP...................................................................................15
CHECK FOR REFRIGERANT LEAKS...............................15
START-UP HEATING AND MAKE ADJUSTMENTS......16
CHECK HEATING CONTROL.......................................16
CHECK GAS INPUT........................................................16
ADJUST GAS INPUT ......................................................16
CHECK BURNER FLAME..............................................20
AIRFLOW AND TEMPERATURE RISE.......................20
HEATING SEQUENCE OF OPERATION.....................20
LIMIT SWITCHES...........................................................20
AUXILIARY LIMIT SWITCH (ROLLOUT)..................21
START-UP COOLING AND MAKE ADJUSTMENTS......21
CHECKING COOLING CONTROL OPERATION .......21
CHECKING AND ADJUSTING REFRIGERANT
CHARGE...........................................................................21
INDOOR AIRFLOW AND AIRFLOW ADJUST-
MENTS..............................................................................22
COOLING SEQUENCE OF OPERATION.....................22
MAINTENANCE.........................................................................22
AIR FILTER......................................................................25
EVAPORATOR BLOWER AND MOTOR.....................25
FLUE GAS PASSAGEWAYS .........................................27
COMBUSTION-AIR BLOWER.......................................27
LIMIT SWITCH................................................................28
BURNER IGNITION........................................................28
MAIN BURNERS.............................................................28
CONDENSER COIL, EVAPORATOR COIL, AND
CONDENSATE DRAIN PAN..........................................29
CONDENSER FAN ..........................................................29
ELECTRICAL CONTROLS AND WIRING ..................30
REFRIGERANT CIRCUIT...............................................30
GAS INPUT ......................................................................30
EVAPORATOR AIRFLOW.............................................30
METERING DEVICE ACUTROL DEVICE .............30
LIQUID LINE STRAINER ..............................................30
TROUBLESHOOTING ...............................................................30
START-UP CHECKLIST............................................................30
NOTE TO INSTALLER — Before the installation, READ THESE
INSTRUCTIONS CAREFULLY AND COMPLETELY. Also,
make sure the User’s Manual and Replacement Guide are left with
the unit after installation. The furnace is NOT to be used for
temporary heating of buildings or structures under construction.
SAFETY CONSIDERATIONS
Installation and servicing of air-conditioning equipment can be
hazardous due to system pressure and electrical components. Only
trained and qualified personnel should install, repair, or service
air-conditioning equipment.
Fig. 1—Unit 48GS and 48GX
(Low NO
x
Model Available)
A99338
Visit www.carrier.com
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4
Tab 1a 6a
PC 101 Catalog No. 534–80121 Printed in U.S.A. Form 48GS,GX-5SI Pg 1 7-02 Replaces: 48GS,GX-4SI

Summary of content (36 pages)