User`s manual

HFATUNG & COOLING
48GS, 48GX
Single Packaged Gas Heating/
Electric Cooling Units
%isdt_ v_v_carrier.corn
Installation, Start-Up, and Operating
48GS Sizes 018-060, 48GX Sizes 024-060
NOTE: Read the entire instruction manual before starting the
installation
TABLE OF CONTENTS
SAFETY C ONSIDERATI(INS 1
INTRODE CTION 2
RECEIVING AND INSTALLATION .......................................... 2
CHECK EQUIPMENT ............................................................. 2
IDENTIFY EJNIT ................................................................ 2
INSPECT SHIPMENT ........................................................ 2
INSTALLATION ................................................................ 2
PROVIDE UNIT SUPPORT. ................................................... 2
ROOF (LRB ....................................................................... 2
SLAB MOUNT ................................................................... 2
GROL_D MOL_T ............................................................ 5
FIELD FABRICATE DUCTW()RK ........................................ 5
PROVIDE CLEARAN( ES ...................................................... 6
RIG AND PLA(E ENIT ......................................................... 7
CONNECT CONDENSATE DRAIN ...................................... 7
INSTALL FLUE HOOD .......................................................... 8
INSTALL GAS PIPING ........................................................... 8
INSTALL DUCT ( ONNE( TIONS ...................................... 10
(ONFIGURING UNITS FOR DO\}_TLOW (VERTI-
CAL) DISCHARGE .......................................................... 10
INSTALL ELECTRICAL ( ONNE(TIONS ......................... 12
HIGH-V()LTAGE CONNECTIONS ................................ 12
SPECIAL PROCEDURES FOR 208°V OPERATION ._ 13
CONTROL VOLTAGE CONNECTIONS ....................... 13
HEAT ANTICIPATOR SETTING ................................... 13
TRAN SFORMER PR()TECTION .................................... 13
PRE-START-E P .......................................................................... 15
START-UP ................................................................................... 15
(HECK FOR REFRIGERANT LEAKS ............................... 15
START°UP HEATING AND MAKE ADJUSTMENTS ...... 16
CHE(K HEATING CONTROL ....................................... 16
CHECK GAS INPUT ........................................................ !6
ADJUST GAS INPET ...................................................... 16
CHECK BURNER FLAME .............................................. 20
AIRFLOW AND TEMPERATURE RISE ....................... 20
HEATING SEQUEN(E OF OPERATION ..................... 20
LIMIT SWITCHES ........................................................... 20
AE XILIARY LIMIT SWITCH (ROLLOE T) .................. 21
START°E P COOLING AND MAKE ADJUSTMENTS ...... 21
CHECKING COOLING CONTROL OPERATION ....... 2!
< HE(KING AND ADJUSTING REFRIGERANT
CHARGE ........................................................................... 21
INDOOR AIRFLOW AND AIRFLOW ADJUST-
MENTS .............................................................................. 22
COOLING SEQE ENCE OF OPERATION ..................... 22
MAINTENANCE ......................................................................... 22
AIR FILTER ...................................................................... 25
EVAPORATOR BLOWER AND MOT()R ..................... 25
FLEE GAS PASSAGEWAYS ......................................... 27
COMBUSTION-AIR BLOWER ....................................... 27
LIMIT SWIT(H ................................................................ 28
BURNER IGNITION ........................................................ 28
MAIN BE RNERS ............................................................. 28
CONDENSER COIL, EVAPORATOR (OIL, AND
CONDENSATE DRAIN PAN .......................................... 29
CONDENSER FAN .......................................................... 29
ELECTRICAL CONTROLS AND WIRING .................. 30
REFRIGERANT CIRCUIT ............................................... 30
GAS INPUT ...................................................................... 30
EVAPORATOR AIRFLOW ............................................. 30
METERING DEVICE A(UTROL DEVICE ............. 30
LIQUID LINE STRAINER .............................................. 30
TROE BLESHOOTING ............................................................... 30
START-UP CHEf KLIST ............................................................ 30
NOTE TO INSTALLER Before the installatiom READ THESE
INSTRU(TIONS CAREFELLY AND (OMPLETELY. Also,
make sure the User's Manual and Replacement Guide are left with
the unit after installation. The furnace is NOT to be used for
temporary heating of buildings or structures under construction.
A99338
Fig. 1--Unit 48GS and 48GX
(Low NO× Model Available)
SAFETY CONSIDERATIONS
Installation and servicing of air-conditioning equipment can be
hazardous due to system pressure and ebctrical components Only
trained and qualified personnel should install, repair, or service
air-conditioning equipment.
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring oNigations.
PC 101 Catalog No 534-80128 Printed in U.S.A Form 48GS.GX-6SI Pg 1 11-02 Replaces: 48GS.GX-5SI

Summary of content (36 pages)