Operating instructions
ııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııııı
www.fptgroup.com
Neo
Installation & Operating Instructions
Page 14
3.11 Removing the Terminal Cover
3.11.1 Frame Size 2 3.11.2 Frame Size 3
3.11.3 Frame Size 4
Using a suitable
flat blade
screwdriver,
rotate the four
retaining screws
indicated until the
screw slot is
verical.
Terminal Cover Release Screws
3.11.4 Frame Size 5
Using a suitable
flat blade
screwdriver,
rotate the four
retaining screws
indicated until the
screw slot is
verical.