Specifications
8
OPERATION OF CRYO-CYL 120 / 180 / 230 LP
22
I
tem Part No Qty Spares * Description
1
11769595 1 Globe Valve – 3/8" FPT (Liquid) (Blue)
2
1110072 2 1 Male Connector – 1/2" ODT X 3/8" MPT (Argon or Nitrogen)
2
1110112 2 1 Male Connector – 5/8" ODT X 3/8" MPT (Oxygen)
3 11905956 2 Globe Valve – 3/8" FPT (Vent)
4 11692575 1 Globe Valve – 3/8" FPT (P.B.)
5 2015169 1 1 Pressure Gauge (0-100 psi)
6 11884770 1 1 Relief Valve (22 psi)
7 1911622 1 1 Rupture Disc (200 psi)
8 1211102 1 Brass Plug – 1/4” MPT
9 2300094 1 1 O-ring (silicon) Liquid Level Gauge
10 5410486 1 1 Level Gauge Protector (Yellow)
11 2910501 3 Bolt – 1/4-20 X 5/8" Lg. (S.S.)
12 2910601 3 Lockwasher – 1/4" (S.S.)"
13 1210752 1 Brass Cap – 1/4” FPT
14 10658826 1 1 Level Gauge (see pg 63)
15 10658826 – Pressure Building Regulator Kit (OPTIONAL)
15a 10582809 1 Pressure Building Regulator
15b 1011432 1 Male Elbow - 3/8” OD x 1/4” MPT
15c 8512163 1 Copper Tubing - 3/8” ODT-5”
15d 1011442 1 Male Elbow - 3/8” OD x 3/8” MPT
16 11732629 1 Pump-Out Body
17 11732637 1 Pump-Out Plug
18 2300059 2 O-ring, Pump-Out Plug
19 3911217 1 Dust Cap, Pump-Out
20 3811609 1
Metal Tag – Vent
21 3811619 1 Metal Tag – Pressure Building
22 3811589 1 Metal Tag – Liquid
23 12967551 1 Metal Tag – Relief Valve
* Recommended spare parts
Pressure Building (Option)
The Cryo-Cyl LP is equipped with an internal pressure
building coil and plumbing stubs for the optional PB
valve and regulator. The following procedure should be
used for maintaining pressure during liquid withdrawal
if the pressure building option is part of the Cryo-Cyl LP
cylinder.
1.
Open the PB isolation valve (Item 3) prior to
liquid withdrawal.
2. Allow the pressure to rise in the cylinder until the
regulator shuts off the PB circuit.
3. Transfer liquid as described in this operational
sheet.
4.
Close the PB valve when liquid transfer is
complete.