Specifications
9
OPERATION OF DURA-CYL MCR 160 / 180 / 200 / 230 / 265MP
28
Gas Withdrawal
The liquid cylinder will deliver gas at various flow rates
and temperatures (as shown in Table J1, page 13) for
different applications. The flow rate is controlled by the
equipment that is being supplied gas from the liquid
cylinder. The continuous flow rate (as shown in the
specification – page 14-16) indicates the flow rate that
will normally provide gas at a reasonable temperature
and should not be exceeded. Higher flow rates may
provide very cold gas that could damage the equip-
ment that they are attached to. To supply gaseous
product follow this step by step procedure:
1. Connect the proper regulator to the liquid
cylinders gas use outlet (Item 71).
2. Connect the proper hose between the final line
regulator and the receiving equipment.
3. Open the pressure building valve (Item 57).
4. Allow pressure (refer to gauge – Item 50) to build
to the operating pressure of 140 psi (9.7 BAR).
5. Open the gas use valve (Item 55).
6. Adjust the gas use regulator for the proper de-
livery pressure.
7. When the gas delivery is completed, close all liq-
uid cylinder valves.
CAUTION: The liquid and vent valves on an empty
liquid cylinder should always be kept closed to
protect the inner vessel and plumbing from being
c
ontaminated.
Service and Maintenance
Refer to section 15 and 16 of this manual to trouble
shoot problems and service these liquid cylinders.