Reference Guide Manual

Find the slope of a pipe Run if it drops 6 Inches
over 50 Feet. What is its Angle and Percent Grade?
KEYSTROKES DISPLAY
0.
RUN 50 FEET 0 INCH
OFST 6 INCH
% GRD 1.
GRD 0.01
SLP 0 FEET 1/8 INCH
/Ø 0.57º
Calculate Pipe Length for a Rolling Offset with
a 4” Roll, 5” Offset and a 45º Fitting Angle.
KEYSTROKES DISPLAY
0.
/Ø 45.00 º
OFST 5 INCH
LNTH 9 1/16 INCH
ContinuepressingtheTravelkeytoviewall
relatedvalues.
(setback) STBK 0 FEET 6-3/8 INCH
BEND 45.00 º
OFST 5 INCH
ROLL 4 INCH
If a pipe Run requires 1/8” drop per foot for
drainage, how much total drop is required for
a 25’ Run?
4095 Inside_Corrected.indd 28 4/27/2009 8:42:59 AM