Brochure
Installation
The dirt separator must always be installed in a vertical
position, preferably on the return circuit upstream of the boiler
(or chiller). This enables it to intercept impurities already
present in the circuit, particularly when it is first started,
before they reach the boiler (or chiller).
T
P
F
A
T
Shut-off valve
Ball valve
Ballstop
Thermometer
Differential by-pass valve
Flow switch
Zone valve
Pump
Autoflow
Stub pipe
Temperature sensor
Safety thermostat
Regulator
Expansion tank
3-way cock
Pressure switch
Control pocket
Gas filter
Gas regulator
Y-strainer
Fuel shut-off valve
Air separator
Vibration damping coupler
Pocket
Pressure relief valve
Backflow preventer
Application diagram
P
A
T
F
T
T
Tmax110∞C
P
max 10bar
Tmax 105∞C
P
max 10bar
BI-DIRECTIONAL
Tmax 110∞C
P
max 10bar
Tmax 105∞C
P
max 10bar
BI-DIRECTIONAL
Tmax110∞C
P
max10bar
Tmax105∞C
P
max10bar
BI-DIRECTIONAL
Tmax110∞C
P
max10bar
Tmax105∞C
P
max10bar
BI-DIRECTIONAL
Tmax110∞C
P
max10bar
Tmax105∞C
P
max10bar
BI-DIRECTIONAL
CHILLER






