Installation Guide

Questions? (888) 788-2254
www.CaliBamboo.com
Engineered Flooring Installation Guide
Before you begin installation, remember to P.A.C.E. yourself with the checklist below. Full installation
instructions and maintenance guidelines can also be found online at www.CaliBamboo.com
Pre-Installation
Hyrbid™ Engineered
Pre-Installation Checklist
P
A
C
E
Thank you for choosing Cali Bamboo® ooring!
Now that you have chosen the World’s Hardest
Floors™ we recommend that you P.A.C.E. yourself
and review the following checklist:
Dont forget to review Cali Bamboo® Flooring
Installation Guidelines for detailed instructions.
calibamboo.com/bamboo-oor-installation-guide.html
PREPARE
THE SUBFLOOR
ACCLIMATE
FLOORING
CONTROL
ENVIRONMENT
EXPANSION
GAPS
P ACE
EXPANSION
GAPS
Engineered ooring can be used in areas ranging from
35% to 65% relative humidity.
Leave at least 1/2” expansion spaces between ooring and ALL
vertical objects (walls, cabinets, pipes, etc.) Large ooring runs
may require additional expansion space. For oating oors, use
transition moldings between rooms and doorways 3ft. or less.
Undercut door jambs and casings to provide adequate
expansion space. Do not screw or nail cabinetry or other
permanent xtures to a oating oor.
35-65% rH
1/2” Expansion Gap
1/2” Spacer
Baseboard
PA C E
CONTROL
ENVIR
ONMENT
Make sure the suboor is at, level, clean and free of debris.
New concrete must be cured for at least 60 days. Test the
suboor moisture prior to installation and apply an
appropriate moisture barrier. Cali Bamboo recommends
Titebond® 531+ on concrete suboors. Although, other
moisture barriers are available.
MOISTURE
BARRIER
Use a Moisture Barrier on Concrete
PA CE
ACCLIMATE
FL
OORING
For Engineered ooring, lay boxes on the oor and only open
box ends as shown above.
Acclimate your oor as close to
the installation area as possible, for 72 hours in normal
living conditions.
Acclimate Your Engineered Flooring For 72 Hours
PACE
PREPARE
THE SUBFL
OOR