Installation Guide
Questions? (888) 788-2254
www.CaliFloors.com
GeoWood
®
Flooring Installation Guide
Floating Click-Lock GeoWood Plank Installation (Pages 3-8)
Before you begin installation, remember to P.A.C.E. yourself with the checklist below. Full installation
instructions and maintenance guidelines can also be found online at www.CaliFloors.com
Pre-Installation
P ACE
EXPANSION
GAPS
GeoWood ooring can be used in areas ranging from
50°F to 100°F. The ideal indoor humidity range for
GeoWood is 35-65% relative humidity.
Leave at least 3/8” expansion spaces between ooring and ALL
vertical objects (walls, cabinets, pipes, etc.). Large ooring runs may
require additional expansion space. Flooring runs over 40 feet
require additional expansion space or transitional pieces. A
t-molding must be used in doorways and openings between rooms
3 feet wide or less. Undercut door jambs and casings to provide
adequate expansion space. Do not screw or nail cabinetry or other
permanent xtures to a oating oor.
50-100°F
3/8” Expansion Gap
3/8” Spacer
Baseboard
PA C E
CONTROL
ENVIRONMENT
Make sure the suboor is at, level, clean and free of
debris. New concrete must be cured for at least 60 days.
Test the suboor moisture prior to installation and apply
an appropriate moisture barrier such as 6mil Plastic on
concrete suboors.
Use 6mil Plastic on Concrete
PA CE
ACCLIMATE
FLOORING
For GeoWood ooring, lay boxes at on the oor and only
open box ends as shown above.
Acclimate your oor as
close to the installation area as possible, for 24 hours in
normal living conditions.
Acclimate Your GeoWood Flooring for 24 hrs
PACE
PREPARE
THE SUBFLOOR
35-65% rH
Page 4