Installation Guide

Questions? (888) 788-2254
www.CaliFloors.com
GeoWood
®
Flooring Installation Guide
Floating Click-Lock GeoWood Plank Installation (Pages 3-8)
Before you begin installation, remember to P.A.C.E. yourself with the checklist below. Full installation
instructions and maintenance guidelines can also be found online at www.CaliFloors.com
Pre-Installation
P ACE
EXPANSION
GAPS
GeoWood ooring can be used in areas ranging from
50°F to 100°F. The ideal indoor humidity range for
GeoWood is 35-65% relative humidity.
Leave at least 3/8” expansion spaces between ooring and ALL
vertical objects (walls, cabinets, pipes, etc.). Large ooring runs may
require additional expansion space. Flooring runs over 40 feet
require additional expansion space or transitional pieces. A
t-molding must be used in doorways and openings between rooms
3 feet wide or less. Undercut door jambs and casings to provide
adequate expansion space. Do not screw or nail cabinetry or other
permanent xtures to a oating oor.
50-100°F
3/8” Expansion Gap
3/8” Spacer
Baseboard
PA C E
CONTROL
ENVIRONMENT
Make sure the suboor is at, level, clean and free of
debris. New concrete must be cured for at least 60 days.
Test the suboor moisture prior to installation and apply
an appropriate moisture barrier such as 6mil Plastic on
concrete suboors.
Use 6mil Plastic on Concrete
PA CE
ACCLIMATE
FLOORING
For GeoWood ooring, lay boxes at on the oor and only
open box ends as shown above.
Acclimate your oor as
close to the installation area as possible, for 24 hours in
normal living conditions.
Acclimate Your GeoWood Flooring for 24 hrs
PACE
PREPARE
THE SUBFLOOR
35-65% rH
Page 4