Installation Guide

Questions? (888) 788-2254
www.CaliFloors.com
Cali Vinyl Flooring Installation Guide
Glue Down Luxury Vinyl Pro Plank Installation (Pages 11-16)
Before you begin installation, remember to P.A.C.E. yourself with the checklist below. Full installation
instructions and maintenance guidelines can also be found online at www.CaliFloors.com
Pre-Installation
1/4” Expansion Gap
1/4” Spacer
Baseboard
P ACE
EXPANSION
GAPS
32-113°F
PA C E
CONTROL
ENVIRONMENT
Make sure the suboor is at, level, clean and free of
debris. New concrete must be cured for at least 60 days.
Test the suboor moisture prior to installation and apply
an appropriate moisture barrier on concrete suboors or
a vapor barrier on plywood. (Required adhesive will act as
moisture/vapor barrier.)
Required Adhesive will act as Moisture Barrier
PA CE
ACCLIMATE
FLOORING
No Acclimation Needed.
PACE
PREPARE
THE SUBFLOOR
Leave at least 1/4” expansion spaces between ooring
and ALL vertical objects (walls, cabinets, pipes, etc.)
Large ooring runs may require additional expansion
space. Undercut door jambs and casings to provide
adequate expansion space. Cali Bamboo® does not
recommend screwing or nailing cabinetry or other
permanent xtures to the ooring.
Vinyl ooring can be used in areas ranging
from 32°F to 113°F.
Page 12