Installation Guide

Questions? (888) 788-2254
www.CaliFloors.com
Cali Vinyl Pro Flooring Installation Guide
Floating Click-Lock Luxury Vinyl Pro Plank Installation (Pages 3-10)
Before you begin installation, remember to P.A.C.E. yourself with the checklist below. Full installation
instructions and maintenance guidelines can also be found online at www.CaliFloors.com
Pre-Installation
P ACE
EXPANSION
GAPS
Vinyl ooring can be used in areas ranging
from 32°F to 113°F.
Leave at least 1/4” expansion spaces between ooring
and ALL vertical objects (walls, cabinets, pipes, etc.)
Large ooring runs may require additional expansion
space. Undercut door jambs and casings to provide
adequate expansion space. Cali Bamboo® does not
recommend screwing or nailing cabinetry or other
permanent xtures to the ooring.
32-113°F
1/4” Expansion Gap
1/4” Spacer
Baseboard
PA C E
CONTROL
ENVIRONMENT
Make sure the suboor is at, level, clean and free of
debris. New concrete must be cured for at least 60 days.
Test the suboor moisture prior to installation and apply
an appropriate moisture barrier such as 6mil Plastic on
concrete suboors.
Use 6mil Plastic on Concrete
PA CE
ACCLIMATE
FLOORING
PACE
PREPARE
THE SUBFLOOR
No Acclimation Needed.
Page 4